Schedulling simulation for high-rise building comparison on time impact

Saved in:
Bibliographic Details
Main Author: Ismail, Asmadi
Format: Thesis
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/18522/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.18522
record_format eprints
spelling my.utm.185222011-11-18T04:34:57Z http://eprints.utm.my/id/eprint/18522/ Schedulling simulation for high-rise building comparison on time impact Ismail, Asmadi TA Engineering (General). Civil engineering (General) 2009 Thesis NonPeerReviewed Ismail, Asmadi (2009) Schedulling simulation for high-rise building comparison on time impact. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ismail, Asmadi
Schedulling simulation for high-rise building comparison on time impact
format Thesis
author Ismail, Asmadi
author_facet Ismail, Asmadi
author_sort Ismail, Asmadi
title Schedulling simulation for high-rise building comparison on time impact
title_short Schedulling simulation for high-rise building comparison on time impact
title_full Schedulling simulation for high-rise building comparison on time impact
title_fullStr Schedulling simulation for high-rise building comparison on time impact
title_full_unstemmed Schedulling simulation for high-rise building comparison on time impact
title_sort schedulling simulation for high-rise building comparison on time impact
publishDate 2009
url http://eprints.utm.my/id/eprint/18522/
_version_ 1643646924305203200
score 13.19449