Contractor's right to claim for extra works
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18211/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.18211 |
---|---|
record_format |
eprints |
spelling |
my.utm.182112011-11-18T04:32:16Z http://eprints.utm.my/id/eprint/18211/ Contractor's right to claim for extra works Yap, Chiaw Guan Unspecified 2009 Thesis NonPeerReviewed Yap, Chiaw Guan (2009) Contractor's right to claim for extra works. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
Unspecified |
spellingShingle |
Unspecified Yap, Chiaw Guan Contractor's right to claim for extra works |
format |
Thesis |
author |
Yap, Chiaw Guan |
author_facet |
Yap, Chiaw Guan |
author_sort |
Yap, Chiaw Guan |
title |
Contractor's right to claim for extra works |
title_short |
Contractor's right to claim for extra works |
title_full |
Contractor's right to claim for extra works |
title_fullStr |
Contractor's right to claim for extra works |
title_full_unstemmed |
Contractor's right to claim for extra works |
title_sort |
contractor's right to claim for extra works |
publishDate |
2009 |
url |
http://eprints.utm.my/id/eprint/18211/ |
_version_ |
1643646832501325824 |
score |
13.160551 |