Evidence that are needed to claim for direct loss and
Saved in:
Main Author: | Badruddin, Husna |
---|---|
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18018/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Claim due to discrepancies in contract documents
by: Ibrahim, Wan Azlina
Published: (2009) -
Contractor's right to claim for extra works
by: Yap, Chiaw Guan
Published: (2009) -
The principle in assessing the quantum of acceleration claim for international projects
by: Jefri Athur, Dedeng
Published: (2012) -
An analysis of the commonwealth courts decisions on liabilities of construction professionals with special reference to post-completion claims
by: Wan Ahmad, Wan Azlan
Published: (1996) -
Predicting refinery energy losses due to fouling in heat exchangers
by: Abd. Shattar, Normurniyati
Published: (2012)