Factors influence construction time performance for IBS in Malaysia Construction Industry
The demand of building construction in Malaysia has increased rapidly from year to year together with the establishment of Industrialized Building System (IBS). IBS have been introduced to speed up the construction time and built affordable and quality houses. However, the traditional construction m...
Saved in:
Main Author: | Salahuddin, Siti Nur Hafizeanie |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/16415/16/SitiNurHafizeaneMFKA2010.pdf http://eprints.utm.my/id/eprint/16415/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Barriers in the implementation of IBS formwork in Malaysian construction industry
by: Siti Nur Syafiqah, Mohd Sa'don
Published: (2017) -
Constructability comparison between IBS and conventional construction
by: Harirchian, Ehsan
Published: (2015) -
Validation of the guidelines for sustainable construction of Industrialized Building System (IBS)
by: Yunus, Riduan, et al.
Published: (2023) -
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018) -
Safety aspect in installation of industrialized building system (IBS) formwork in Malaysian construction industry
by: Nur Izzati, Adnan
Published: (2018)