Schedule risk analysis in offshore development project

Every project has its own risks. One of the common risk during project execution is the risk associated with scheduling. The important issue facing project scheduling is the inability to incorporate uncertainty of activity duration into the schedule. Delays in completing continuous process industry...

Full description

Saved in:
Bibliographic Details
Main Author: Hermanto, Budi
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/15306/13/BudiHermantoMFKA2010.pdf
http://eprints.utm.my/id/eprint/15306/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.15306
record_format eprints
spelling my.utm.153062017-09-19T03:45:10Z http://eprints.utm.my/id/eprint/15306/ Schedule risk analysis in offshore development project Hermanto, Budi TA Engineering (General). Civil engineering (General) Every project has its own risks. One of the common risk during project execution is the risk associated with scheduling. The important issue facing project scheduling is the inability to incorporate uncertainty of activity duration into the schedule. Delays in completing continuous process industry projects such as oil and gas offshore development projects can cause millions of dollars of foregone income per day. The aim of this study is to investigate the implementation of schedule risk analysis in oil and gas offshore development projects. By performing schedule risk analysis, the uncertainty in activity duration as well as the implication to the project schedule can be mitigated. The methodologies adopted for this study include questionnaire survey, interview and case study. The finding of the study has identified the high risk factors that commonly contribute to the schedule delay. It is also determined that by conducting schedule risk analysis by using Pertmaster software, the schedule overrun for specific project can be predicted with some degree of accuracy which cannot be done in traditional CPM scheduling. It is hope that this study can be useful for the project team to prevent the risk occurrence by performing effective risk mitigation. 2010-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/15306/13/BudiHermantoMFKA2010.pdf Hermanto, Budi (2010) Schedule risk analysis in offshore development project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Hermanto, Budi
Schedule risk analysis in offshore development project
description Every project has its own risks. One of the common risk during project execution is the risk associated with scheduling. The important issue facing project scheduling is the inability to incorporate uncertainty of activity duration into the schedule. Delays in completing continuous process industry projects such as oil and gas offshore development projects can cause millions of dollars of foregone income per day. The aim of this study is to investigate the implementation of schedule risk analysis in oil and gas offshore development projects. By performing schedule risk analysis, the uncertainty in activity duration as well as the implication to the project schedule can be mitigated. The methodologies adopted for this study include questionnaire survey, interview and case study. The finding of the study has identified the high risk factors that commonly contribute to the schedule delay. It is also determined that by conducting schedule risk analysis by using Pertmaster software, the schedule overrun for specific project can be predicted with some degree of accuracy which cannot be done in traditional CPM scheduling. It is hope that this study can be useful for the project team to prevent the risk occurrence by performing effective risk mitigation.
format Thesis
author Hermanto, Budi
author_facet Hermanto, Budi
author_sort Hermanto, Budi
title Schedule risk analysis in offshore development project
title_short Schedule risk analysis in offshore development project
title_full Schedule risk analysis in offshore development project
title_fullStr Schedule risk analysis in offshore development project
title_full_unstemmed Schedule risk analysis in offshore development project
title_sort schedule risk analysis in offshore development project
publishDate 2010
url http://eprints.utm.my/id/eprint/15306/13/BudiHermantoMFKA2010.pdf
http://eprints.utm.my/id/eprint/15306/
_version_ 1643646485817982976
score 13.18916