Identifying energy saving opportunities in a process plant through preliminary energy audit

Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Manan, Zainuddin
Format: Article
Language:English
Published: Penerbit UTM Press 2003
Subjects:
Online Access:http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf
http://eprints.utm.my/id/eprint/1452/
http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.1452
record_format eprints
spelling my.utm.14522017-11-01T04:17:40Z http://eprints.utm.my/id/eprint/1452/ Identifying energy saving opportunities in a process plant through preliminary energy audit Abdul Manan, Zainuddin TD Environmental technology. Sanitary engineering Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented. Penerbit UTM Press 2003-06 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf Abdul Manan, Zainuddin (2003) Identifying energy saving opportunities in a process plant through preliminary energy audit. Jurnal Teknologi A (38A). pp. 37-48. ISSN 0127-9696 http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TD Environmental technology. Sanitary engineering
spellingShingle TD Environmental technology. Sanitary engineering
Abdul Manan, Zainuddin
Identifying energy saving opportunities in a process plant through preliminary energy audit
description Improving plant energy efficiency requires monitoring, analysis and adjustments of the appropriate plant operating parameters and in some cases, plant modifications. This involves studies of plant energy distribution and the corresponding losses associated with the various uses of energy. The scope and duration of a study may vary depending on the complexity of a plant and various operational requirements and constraints. The recommended practice is to run a preliminary energy audit on a plant before conducting a detailed retrofit project. Such exercise helps plant managers to differentiate between the immediate energy saving potentials from those requiring either some investments or further studies. This paper outlines the methodology and the scope involved in a preliminary study to improve overall plant energy efficiency. The procedure includes plant familiarization, data collection and parameter measurement, analysis of energy consumption and losses in the various sections of a process plant, analysis of the results and recommendation of measures supported by economic justifications. Examples of studies completed for two different plants are also presented.
format Article
author Abdul Manan, Zainuddin
author_facet Abdul Manan, Zainuddin
author_sort Abdul Manan, Zainuddin
title Identifying energy saving opportunities in a process plant through preliminary energy audit
title_short Identifying energy saving opportunities in a process plant through preliminary energy audit
title_full Identifying energy saving opportunities in a process plant through preliminary energy audit
title_fullStr Identifying energy saving opportunities in a process plant through preliminary energy audit
title_full_unstemmed Identifying energy saving opportunities in a process plant through preliminary energy audit
title_sort identifying energy saving opportunities in a process plant through preliminary energy audit
publisher Penerbit UTM Press
publishDate 2003
url http://eprints.utm.my/id/eprint/1452/1/JT38A%5B4%5D.pdf
http://eprints.utm.my/id/eprint/1452/
http://www.penerbit.utm.my/onlinejournal/38/A/JT38A4.pdf
_version_ 1643643339185061888
score 13.18916