A delay time for an automative product under warranty
This chapter concerns with modeling and estimating the delay time parameters based on operational data in the context of warranty case study. The modeling process involves the estimation procedure in the case of HPP( Homogeneous Poisson Process). These include sufficient objective data from MTB (...
Saved in:
Main Authors: | Abdul Majid, Hairudin, Abu Samah, Azurah |
---|---|
Format: | Book Section |
Published: |
Penerbit UTM
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/14298/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prediction of warranty cost and warranty period using neuro-fuzzy approach: case study of automobile warranty data
by: Jamahir, Nur Izzati, et al.
Published: (2013) -
Using reliability information and neuro-fuzzy to predict warranty cost: a case study in fleet vehicle
by: Abd. Majid, Hairudin, et al.
Published: (2013) -
Optimization of warranty cost using genetic algorithm: a case study in fleet vehicle
by: Abd. Majid, Hairudin
Published: (2013) -
An overview on warranty cost modelling in two-dimensional warranty using neuro-fuzzy approach
by: Jamahir, Nur Izzati, et al.
Published: (2012) -
Modelling warranty extensions: a case study in the automotive industry
by: Scarf, P. A., et al.
Published: (2011)