A Study On Variations In Sewerage Construction Projects
Variations in construction have long been a debatable issue among the different participants involved in construction projects. However, only a few formal studies have been carried out to analyse its causes and effects. This study is focused on the frequency and severity of various factors causing v...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2002
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/1420/1/JT37B2.pdf http://eprints.utm.my/id/eprint/1420/ http://www.penerbit.utm.my/onlinejournal/37/B/JT37B2.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.1420 |
---|---|
record_format |
eprints |
spelling |
my.utm.14202017-11-01T04:17:42Z http://eprints.utm.my/id/eprint/1420/ A Study On Variations In Sewerage Construction Projects Kassim, Mohd. Azraai Lee, Jen Loong TA Engineering (General). Civil engineering (General) Variations in construction have long been a debatable issue among the different participants involved in construction projects. However, only a few formal studies have been carried out to analyse its causes and effects. This study is focused on the frequency and severity of various factors causing variations in sewerage networks construction projects. It is important for a company not only to know the variation costs, but also to identify the most likely areas on which to focus in order to reduce these costs for the future projects. All the necessary data and information are obtained from archival files of thirteen projects and verified through interviews. These data are categorised to analyse the frequency and severity of factors. Tables and charts are presented to show the research findings. From the analysis, differing site conditions appear to be the major factors contributing to variations. They average 49.3% of the total number of variations, 56.2% of the total variation costs and 3.8% of the total project costs. Two project characteristics i.e. contract award value and the contractor’s registration grade with the Construction Industry Development Board (which represents the contractor’s specialisation, financial and other resources standing) [1] show certain causal relationships with variations. Penerbit UTM Press 2002-12 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/1420/1/JT37B2.pdf Kassim, Mohd. Azraai and Lee, Jen Loong (2002) A Study On Variations In Sewerage Construction Projects. Jurnal Teknologi B (37B). pp. 13-26. ISSN 0127-9696 http://www.penerbit.utm.my/onlinejournal/37/B/JT37B2.pdf |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Kassim, Mohd. Azraai Lee, Jen Loong A Study On Variations In Sewerage Construction Projects |
description |
Variations in construction have long been a debatable issue among the different participants involved in construction projects. However, only a few formal studies have been carried out to analyse its causes and effects. This study is focused on the frequency and severity of various factors causing variations in sewerage networks construction projects. It is important for a company not only to know the variation costs, but also to identify the most likely areas on which to focus in order to reduce these costs for the future projects. All the necessary data and information are obtained from archival files of thirteen projects and verified through interviews. These data are categorised to analyse the frequency and severity of factors. Tables and charts are presented to show the research findings. From the analysis, differing site conditions appear to be the major factors contributing to variations. They average 49.3% of the total number of variations, 56.2% of the total variation costs and 3.8% of the total project costs. Two project characteristics i.e. contract award value and the contractor’s registration grade with the Construction Industry Development Board (which represents the contractor’s specialisation, financial and other resources standing) [1] show certain causal relationships with variations. |
format |
Article |
author |
Kassim, Mohd. Azraai Lee, Jen Loong |
author_facet |
Kassim, Mohd. Azraai Lee, Jen Loong |
author_sort |
Kassim, Mohd. Azraai |
title |
A Study On Variations In Sewerage Construction Projects |
title_short |
A Study On Variations In Sewerage Construction Projects |
title_full |
A Study On Variations In Sewerage Construction Projects |
title_fullStr |
A Study On Variations In Sewerage Construction Projects |
title_full_unstemmed |
A Study On Variations In Sewerage Construction Projects |
title_sort |
study on variations in sewerage construction projects |
publisher |
Penerbit UTM Press |
publishDate |
2002 |
url |
http://eprints.utm.my/id/eprint/1420/1/JT37B2.pdf http://eprints.utm.my/id/eprint/1420/ http://www.penerbit.utm.my/onlinejournal/37/B/JT37B2.pdf |
_version_ |
1643643328935231488 |
score |
13.18916 |