Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai

The presence of abandoned housing project in Malaysia has present anxiety to various party including Federal Government and buyers. The Malaysian economy has grown 6.2% as announced by Bank Negara in its 2005 Annual Report, despite a faster rate and strong growth apparently abandoned housing project...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Fadzilah
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/142/1/FadzilahIbrahimMFKA2006.pdf
http://eprints.utm.my/id/eprint/142/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.142
record_format eprints
spelling my.utm.1422018-02-19T01:33:23Z http://eprints.utm.my/id/eprint/142/ Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai Ibrahim, Fadzilah TH Building construction The presence of abandoned housing project in Malaysia has present anxiety to various party including Federal Government and buyers. The Malaysian economy has grown 6.2% as announced by Bank Negara in its 2005 Annual Report, despite a faster rate and strong growth apparently abandoned housing project continues to be a bane of the industry, albeit on the declining. Expectation at this time is to minimize the number of abandoned housing projects to propel Malaysia into developed status as articulated in Vision 2020. This paper describes a study on factors causing the abandonment of housing projects and has been conducted based on literature review , interview with the top management in the relevant parties involved and case study. Its is aimed to identify root causes that lead to housing project abandonment, the strategy that had been taken, and the advantages and disadvantages of the existing practice as well as to propose enhancement to the present approach. The finding revealed that incompetent and poor financial management of the developers, financial difficulties as a result of inadequate cash flow, lack of feasibilities studies, competition of new residential projects, inattractive marketing strategies, inexperineced developers, higher financing cost and critical material shortage are categorised as important factors affecting abandoned housing project. Beside the said factors and analysis on the present strategies and practice, abandoned housing project is still exist due to several undisclosed causes such as lack of enforcement for control and monitoring, limtitation of juridisction as well as unavailability of Home Indemnity Insurance. These had caused the revival of abandoned housing project to be hold back. At the end of the study a recommendation has been proposed and it is expected that it will able to be used for improving the present approach of reviving abandoned housing project by taking into consideration the undisclosed root causes. 2006-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/142/1/FadzilahIbrahimMFKA2006.pdf Ibrahim, Fadzilah (2006) Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Ibrahim, Fadzilah
Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
description The presence of abandoned housing project in Malaysia has present anxiety to various party including Federal Government and buyers. The Malaysian economy has grown 6.2% as announced by Bank Negara in its 2005 Annual Report, despite a faster rate and strong growth apparently abandoned housing project continues to be a bane of the industry, albeit on the declining. Expectation at this time is to minimize the number of abandoned housing projects to propel Malaysia into developed status as articulated in Vision 2020. This paper describes a study on factors causing the abandonment of housing projects and has been conducted based on literature review , interview with the top management in the relevant parties involved and case study. Its is aimed to identify root causes that lead to housing project abandonment, the strategy that had been taken, and the advantages and disadvantages of the existing practice as well as to propose enhancement to the present approach. The finding revealed that incompetent and poor financial management of the developers, financial difficulties as a result of inadequate cash flow, lack of feasibilities studies, competition of new residential projects, inattractive marketing strategies, inexperineced developers, higher financing cost and critical material shortage are categorised as important factors affecting abandoned housing project. Beside the said factors and analysis on the present strategies and practice, abandoned housing project is still exist due to several undisclosed causes such as lack of enforcement for control and monitoring, limtitation of juridisction as well as unavailability of Home Indemnity Insurance. These had caused the revival of abandoned housing project to be hold back. At the end of the study a recommendation has been proposed and it is expected that it will able to be used for improving the present approach of reviving abandoned housing project by taking into consideration the undisclosed root causes.
format Thesis
author Ibrahim, Fadzilah
author_facet Ibrahim, Fadzilah
author_sort Ibrahim, Fadzilah
title Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
title_short Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
title_full Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
title_fullStr Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
title_full_unstemmed Faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
title_sort faktor-faktor kritikal bagi pemulihan projek perumahan terbengkalai
publishDate 2006
url http://eprints.utm.my/id/eprint/142/1/FadzilahIbrahimMFKA2006.pdf
http://eprints.utm.my/id/eprint/142/
_version_ 1643643009294663680
score 13.18916