Simulation of sequencing rules in a five-similar-machine job shop

Nowadays, simulation is essential when researching manufacturing process or designing production system. Line performance and equipment utilization are two major points of interest for every manufacturing company in order to increase competitiveness in the global market. The job shop scheduling is t...

Full description

Saved in:
Bibliographic Details
Main Author: Ang, Liqi
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/12686/6/AngLiqiMFKM2010.pdf
http://eprints.utm.my/id/eprint/12686/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.12686
record_format eprints
spelling my.utm.126862017-09-18T06:13:22Z http://eprints.utm.my/id/eprint/12686/ Simulation of sequencing rules in a five-similar-machine job shop Ang, Liqi T Technology (General) Nowadays, simulation is essential when researching manufacturing process or designing production system. Line performance and equipment utilization are two major points of interest for every manufacturing company in order to increase competitiveness in the global market. The job shop scheduling is the allocation of a number of machines to perform a set of jobs. Job shop scheduling problem exists in most of the manufacturing systems in various form. Due to its high mix and low volume manufacturing environment, priority selecting among the jobs is challenging. This project is a real case study which involving a job shop with five similar CNC milling machines. A total of six jobs were performed and each of them consists of a different set of operation. The sequence of the six jobs to enter the system was determined by the sequencing rules including shortest setup time (SST), shortest processing time (SPT), shortest processing time + setup time (SPST), lowest volume (LV), least process (LP) and earliest due date (EDD). The setup time was taken into consideration to make the results more realistic. Due to the complexity of the model, WITNESS was used to simulate all the sequencing rules and the results are obtained. The best rules approach for the company in this study can be determined by comparing the results for each rule. By doing this, the company will be able to make faster and better decision about which job should be processed first instead of pick it randomly among the jobs. The results indicate that no single rule is excellent in all criteria. SPST rule was recommended to the company as it performed the best in terms of total completion time. 2010 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/12686/6/AngLiqiMFKM2010.pdf Ang, Liqi (2010) Simulation of sequencing rules in a five-similar-machine job shop. Masters thesis, Universiti Teknologi Malaysia, Faculty of Mechanical Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Ang, Liqi
Simulation of sequencing rules in a five-similar-machine job shop
description Nowadays, simulation is essential when researching manufacturing process or designing production system. Line performance and equipment utilization are two major points of interest for every manufacturing company in order to increase competitiveness in the global market. The job shop scheduling is the allocation of a number of machines to perform a set of jobs. Job shop scheduling problem exists in most of the manufacturing systems in various form. Due to its high mix and low volume manufacturing environment, priority selecting among the jobs is challenging. This project is a real case study which involving a job shop with five similar CNC milling machines. A total of six jobs were performed and each of them consists of a different set of operation. The sequence of the six jobs to enter the system was determined by the sequencing rules including shortest setup time (SST), shortest processing time (SPT), shortest processing time + setup time (SPST), lowest volume (LV), least process (LP) and earliest due date (EDD). The setup time was taken into consideration to make the results more realistic. Due to the complexity of the model, WITNESS was used to simulate all the sequencing rules and the results are obtained. The best rules approach for the company in this study can be determined by comparing the results for each rule. By doing this, the company will be able to make faster and better decision about which job should be processed first instead of pick it randomly among the jobs. The results indicate that no single rule is excellent in all criteria. SPST rule was recommended to the company as it performed the best in terms of total completion time.
format Thesis
author Ang, Liqi
author_facet Ang, Liqi
author_sort Ang, Liqi
title Simulation of sequencing rules in a five-similar-machine job shop
title_short Simulation of sequencing rules in a five-similar-machine job shop
title_full Simulation of sequencing rules in a five-similar-machine job shop
title_fullStr Simulation of sequencing rules in a five-similar-machine job shop
title_full_unstemmed Simulation of sequencing rules in a five-similar-machine job shop
title_sort simulation of sequencing rules in a five-similar-machine job shop
publishDate 2010
url http://eprints.utm.my/id/eprint/12686/6/AngLiqiMFKM2010.pdf
http://eprints.utm.my/id/eprint/12686/
_version_ 1643646012608217088
score 13.211869