Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)

The application of highway maintenance management is important. It is a centrally implemented tool for consistent decision making to optimize maintenance strategies for entire infrastructure network, in compliance with established policies. However, only some of the highway’s concessionaire has impl...

Full description

Saved in:
Bibliographic Details
Main Author: Harun, Mohd. Harzazi
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/11994/6/MohdHarzaziHarunMFKA2009.pdf
http://eprints.utm.my/id/eprint/11994/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.11994
record_format eprints
spelling my.utm.119942017-09-17T04:20:15Z http://eprints.utm.my/id/eprint/11994/ Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS) Harun, Mohd. Harzazi HD28 Management. Industrial Management TE Highway engineering. Roads and pavements The application of highway maintenance management is important. It is a centrally implemented tool for consistent decision making to optimize maintenance strategies for entire infrastructure network, in compliance with established policies. However, only some of the highway’s concessionaire has implement it. It may due to lack of awareness and lack of requirement by authority. The aim of this study is to investigate the highway maintenance management practiced by PLUS Expressway as the biggest highway concessionaire in Malaysia. Three objectives has been set for this study. The objectives are to study the current practice of the highway maintenance management at PLUS Expressway, to identify types of typical defects occurred to the highway assets and to identify the critical factors in selecting appropriate repair method for different type of defects. The methodology of this study were through document study, site visit and interview with related representative of the PLUS (concessionaire), OPUS-NMM (asset management consultant) and PROPEL (contractor). From this case study, it can be concluded that PLUS has appointed OPUS International (M) Bhd through its project team known as OPUS-Network Maintenance Management (NMM) as their asset management consultatnt. OPUS-NMM integrates network planning and management, periodic inspections, routine and planned maintenance to optimise the ‘whole of life’ cost of asset ownership. The defects that always occur are cracks and broken drain that may contribute to slope failure. Besides, the results show that the design and selecting method for the remedial works depends on the slope characteristic and the severity of the damage. 2009-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/11994/6/MohdHarzaziHarunMFKA2009.pdf Harun, Mohd. Harzazi (2009) Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS). Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HD28 Management. Industrial Management
TE Highway engineering. Roads and pavements
spellingShingle HD28 Management. Industrial Management
TE Highway engineering. Roads and pavements
Harun, Mohd. Harzazi
Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
description The application of highway maintenance management is important. It is a centrally implemented tool for consistent decision making to optimize maintenance strategies for entire infrastructure network, in compliance with established policies. However, only some of the highway’s concessionaire has implement it. It may due to lack of awareness and lack of requirement by authority. The aim of this study is to investigate the highway maintenance management practiced by PLUS Expressway as the biggest highway concessionaire in Malaysia. Three objectives has been set for this study. The objectives are to study the current practice of the highway maintenance management at PLUS Expressway, to identify types of typical defects occurred to the highway assets and to identify the critical factors in selecting appropriate repair method for different type of defects. The methodology of this study were through document study, site visit and interview with related representative of the PLUS (concessionaire), OPUS-NMM (asset management consultant) and PROPEL (contractor). From this case study, it can be concluded that PLUS has appointed OPUS International (M) Bhd through its project team known as OPUS-Network Maintenance Management (NMM) as their asset management consultatnt. OPUS-NMM integrates network planning and management, periodic inspections, routine and planned maintenance to optimise the ‘whole of life’ cost of asset ownership. The defects that always occur are cracks and broken drain that may contribute to slope failure. Besides, the results show that the design and selecting method for the remedial works depends on the slope characteristic and the severity of the damage.
format Thesis
author Harun, Mohd. Harzazi
author_facet Harun, Mohd. Harzazi
author_sort Harun, Mohd. Harzazi
title Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
title_short Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
title_full Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
title_fullStr Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
title_full_unstemmed Highway maintenanance management : case study at Projek Lebuhraya Utara Selatan (PLUS)
title_sort highway maintenanance management : case study at projek lebuhraya utara selatan (plus)
publishDate 2009
url http://eprints.utm.my/id/eprint/11994/6/MohdHarzaziHarunMFKA2009.pdf
http://eprints.utm.my/id/eprint/11994/
_version_ 1643645832223784960
score 13.160551