Improving the performance of precast concrete beam-to-beam connection with inadequate lap length

This paper reports on a feasibility study of different types of precast concrete beam-to-beam connections under inadequate lap length. The aim of the study is to develop a beam-to-beam connection, which is able to produce comparable bond strength with the conventional lapping system although the anc...

Full description

Saved in:
Bibliographic Details
Main Author: Ling, Jen Hua
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/11584/1/LingJenHuaMFKA2007.pdf
http://eprints.utm.my/id/eprint/11584/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items