A case study on the application of 0-1 goal programming : nurse scheduling
The continuous pattern of working 24 hours a day, 7 days a week, needs a working shift environment that could affect the working conditions of the nurses. This involves social life and nurses’ level of health. Therefore the development of a nurse scheduling model that can be accepted well by all par...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11366/6/MunirahRossdyMFS2010.pdf http://eprints.utm.my/id/eprint/11366/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.11366 |
---|---|
record_format |
eprints |
spelling |
my.utm.113662017-09-26T00:50:32Z http://eprints.utm.my/id/eprint/11366/ A case study on the application of 0-1 goal programming : nurse scheduling Rossdy, Munirah QA Mathematics RT Nursing The continuous pattern of working 24 hours a day, 7 days a week, needs a working shift environment that could affect the working conditions of the nurses. This involves social life and nurses’ level of health. Therefore the development of a nurse scheduling model that can be accepted well by all parties is necessary to enable it to be applied in the nurse scheduling system. This nurse scheduling considers policy imposed by the hospital and demand from the nurses so that there is more balance, quality and fairness in the production of the nurse scheduling model. Hence, in this research, 0-1 goal programming approach is applied in the development of nurse scheduling model because of its ability to produce a model with multiple objectives. Approach to the problem was illustrated on the Maternity Ward 2, Hospital Tawau, Sabah involving U29 and U19 nurses. The result obtained by LINGO software version 10.0 shows that the developed model of nurse scheduling using 0-1 goal programming approach performs better than the manual method. This is because it was successful in meeting the hospital policy and nurses’ preferences. 2010-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/11366/6/MunirahRossdyMFS2010.pdf Rossdy, Munirah (2010) A case study on the application of 0-1 goal programming : nurse scheduling. Masters thesis, Universiti Teknologi Malaysia, Faculty of Science. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
QA Mathematics RT Nursing |
spellingShingle |
QA Mathematics RT Nursing Rossdy, Munirah A case study on the application of 0-1 goal programming : nurse scheduling |
description |
The continuous pattern of working 24 hours a day, 7 days a week, needs a working shift environment that could affect the working conditions of the nurses. This involves social life and nurses’ level of health. Therefore the development of a nurse scheduling model that can be accepted well by all parties is necessary to enable it to be applied in the nurse scheduling system. This nurse scheduling considers policy imposed by the hospital and demand from the nurses so that there is more balance, quality and fairness in the production of the nurse scheduling model. Hence, in this research, 0-1 goal programming approach is applied in the development of nurse scheduling model because of its ability to produce a model with multiple objectives. Approach to the problem was illustrated on the Maternity Ward 2, Hospital Tawau, Sabah involving U29 and U19 nurses. The result obtained by LINGO software version 10.0 shows that the developed model of nurse scheduling using 0-1 goal programming approach performs better than the manual method. This is because it was successful in meeting the hospital policy and nurses’ preferences. |
format |
Thesis |
author |
Rossdy, Munirah |
author_facet |
Rossdy, Munirah |
author_sort |
Rossdy, Munirah |
title |
A case study on the application of 0-1 goal programming : nurse scheduling |
title_short |
A case study on the application of 0-1 goal programming : nurse scheduling |
title_full |
A case study on the application of 0-1 goal programming : nurse scheduling |
title_fullStr |
A case study on the application of 0-1 goal programming : nurse scheduling |
title_full_unstemmed |
A case study on the application of 0-1 goal programming : nurse scheduling |
title_sort |
case study on the application of 0-1 goal programming : nurse scheduling |
publishDate |
2010 |
url |
http://eprints.utm.my/id/eprint/11366/6/MunirahRossdyMFS2010.pdf http://eprints.utm.my/id/eprint/11366/ |
_version_ |
1643645661496737792 |
score |
13.214268 |