Dispute resolution in relation to delay of construction project

Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues...

Full description

Saved in:
Bibliographic Details
Main Author: Soon, Tan Kian
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/11232/6/TanKianSoonMFKA2010.pdf
http://eprints.utm.my/id/eprint/11232/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.11232
record_format eprints
spelling my.utm.112322017-09-26T01:31:00Z http://eprints.utm.my/id/eprint/11232/ Dispute resolution in relation to delay of construction project Soon, Tan Kian HD28 Management. Industrial Management TH Building construction Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues. Usually, people always look for more economical and time saving method for dispute settlement. But there are still a portion of people choose to settle via litigation proceeding. This problem brought to this study which aims to investigate the origin of disputes settlement via litigation proceeding that contributed by delay in project undertaking. The objectives of the study include the analysis of taxonomy of delay and review of the available dispute resolution techniques. Analysis on the trend of delay dispute resolution by litigation in the selected cases is made. Third objective was set where the outline for dispute avoidance is formulated. This study is restricted to the cases within Malaysia. Analysis shows that the main causes of the delay are the mostly defaulted by the proprietor; the executors were showed as the majority party in filing the court suit among which they obtained high percentage in winning the award. The study shows that delay dispute settlement via litigation proceeding generally occurred when the financial conflict between parties take place. In order to avoid the settlement of dispute via litigation, measures of dispute avoidance are proposed. The findings are expected to be useful as further references for parties in facilitate the execution of their construction work. 2010-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/11232/6/TanKianSoonMFKA2010.pdf Soon, Tan Kian (2010) Dispute resolution in relation to delay of construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HD28 Management. Industrial Management
TH Building construction
spellingShingle HD28 Management. Industrial Management
TH Building construction
Soon, Tan Kian
Dispute resolution in relation to delay of construction project
description Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues. Usually, people always look for more economical and time saving method for dispute settlement. But there are still a portion of people choose to settle via litigation proceeding. This problem brought to this study which aims to investigate the origin of disputes settlement via litigation proceeding that contributed by delay in project undertaking. The objectives of the study include the analysis of taxonomy of delay and review of the available dispute resolution techniques. Analysis on the trend of delay dispute resolution by litigation in the selected cases is made. Third objective was set where the outline for dispute avoidance is formulated. This study is restricted to the cases within Malaysia. Analysis shows that the main causes of the delay are the mostly defaulted by the proprietor; the executors were showed as the majority party in filing the court suit among which they obtained high percentage in winning the award. The study shows that delay dispute settlement via litigation proceeding generally occurred when the financial conflict between parties take place. In order to avoid the settlement of dispute via litigation, measures of dispute avoidance are proposed. The findings are expected to be useful as further references for parties in facilitate the execution of their construction work.
format Thesis
author Soon, Tan Kian
author_facet Soon, Tan Kian
author_sort Soon, Tan Kian
title Dispute resolution in relation to delay of construction project
title_short Dispute resolution in relation to delay of construction project
title_full Dispute resolution in relation to delay of construction project
title_fullStr Dispute resolution in relation to delay of construction project
title_full_unstemmed Dispute resolution in relation to delay of construction project
title_sort dispute resolution in relation to delay of construction project
publishDate 2010
url http://eprints.utm.my/id/eprint/11232/6/TanKianSoonMFKA2010.pdf
http://eprints.utm.my/id/eprint/11232/
_version_ 1643645623199596544
score 13.159267