Analysing the project delay causes and improving quality using multi-project strategies.

Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side...

Full description

Saved in:
Bibliographic Details
Main Authors: Azman, Nur Amirah Syahirah, Ramlie, Faizir, Wan Muhamad, Wan Zuki Azman, Abu, Mohd. Yazid, Harudin, Nolia
Format: Article
Language:English
Published: Akademia Baru Publishing (M) Sdn. Bhd. 2023
Subjects:
Online Access:http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf
http://eprints.utm.my/108785/
http://dx.doi.org/10.37934/arbms.34.1.2334
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.108785
record_format eprints
spelling my.utm.1087852024-12-09T06:20:07Z http://eprints.utm.my/108785/ Analysing the project delay causes and improving quality using multi-project strategies. Azman, Nur Amirah Syahirah Ramlie, Faizir Wan Muhamad, Wan Zuki Azman Abu, Mohd. Yazid Harudin, Nolia TA Engineering (General). Civil engineering (General) Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours. Akademia Baru Publishing (M) Sdn. Bhd. 2023-12-23 Article PeerReviewed application/pdf en http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf Azman, Nur Amirah Syahirah and Ramlie, Faizir and Wan Muhamad, Wan Zuki Azman and Abu, Mohd. Yazid and Harudin, Nolia (2023) Analysing the project delay causes and improving quality using multi-project strategies. Journal of Advanced Research in Business and Management Studies, 34 (1). pp. 23-34. ISSN 2462-1935 http://dx.doi.org/10.37934/arbms.34.1.2334 DOI:10.37934/arbms.34.1.2334
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Azman, Nur Amirah Syahirah
Ramlie, Faizir
Wan Muhamad, Wan Zuki Azman
Abu, Mohd. Yazid
Harudin, Nolia
Analysing the project delay causes and improving quality using multi-project strategies.
description Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours.
format Article
author Azman, Nur Amirah Syahirah
Ramlie, Faizir
Wan Muhamad, Wan Zuki Azman
Abu, Mohd. Yazid
Harudin, Nolia
author_facet Azman, Nur Amirah Syahirah
Ramlie, Faizir
Wan Muhamad, Wan Zuki Azman
Abu, Mohd. Yazid
Harudin, Nolia
author_sort Azman, Nur Amirah Syahirah
title Analysing the project delay causes and improving quality using multi-project strategies.
title_short Analysing the project delay causes and improving quality using multi-project strategies.
title_full Analysing the project delay causes and improving quality using multi-project strategies.
title_fullStr Analysing the project delay causes and improving quality using multi-project strategies.
title_full_unstemmed Analysing the project delay causes and improving quality using multi-project strategies.
title_sort analysing the project delay causes and improving quality using multi-project strategies.
publisher Akademia Baru Publishing (M) Sdn. Bhd.
publishDate 2023
url http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf
http://eprints.utm.my/108785/
http://dx.doi.org/10.37934/arbms.34.1.2334
_version_ 1818834048579010560
score 13.223943