Analysing the project delay causes and improving quality using multi-project strategies.
Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Akademia Baru Publishing (M) Sdn. Bhd.
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf http://eprints.utm.my/108785/ http://dx.doi.org/10.37934/arbms.34.1.2334 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.108785 |
---|---|
record_format |
eprints |
spelling |
my.utm.1087852024-12-09T06:20:07Z http://eprints.utm.my/108785/ Analysing the project delay causes and improving quality using multi-project strategies. Azman, Nur Amirah Syahirah Ramlie, Faizir Wan Muhamad, Wan Zuki Azman Abu, Mohd. Yazid Harudin, Nolia TA Engineering (General). Civil engineering (General) Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours. Akademia Baru Publishing (M) Sdn. Bhd. 2023-12-23 Article PeerReviewed application/pdf en http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf Azman, Nur Amirah Syahirah and Ramlie, Faizir and Wan Muhamad, Wan Zuki Azman and Abu, Mohd. Yazid and Harudin, Nolia (2023) Analysing the project delay causes and improving quality using multi-project strategies. Journal of Advanced Research in Business and Management Studies, 34 (1). pp. 23-34. ISSN 2462-1935 http://dx.doi.org/10.37934/arbms.34.1.2334 DOI:10.37934/arbms.34.1.2334 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Azman, Nur Amirah Syahirah Ramlie, Faizir Wan Muhamad, Wan Zuki Azman Abu, Mohd. Yazid Harudin, Nolia Analysing the project delay causes and improving quality using multi-project strategies. |
description |
Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours. |
format |
Article |
author |
Azman, Nur Amirah Syahirah Ramlie, Faizir Wan Muhamad, Wan Zuki Azman Abu, Mohd. Yazid Harudin, Nolia |
author_facet |
Azman, Nur Amirah Syahirah Ramlie, Faizir Wan Muhamad, Wan Zuki Azman Abu, Mohd. Yazid Harudin, Nolia |
author_sort |
Azman, Nur Amirah Syahirah |
title |
Analysing the project delay causes and improving quality using multi-project strategies. |
title_short |
Analysing the project delay causes and improving quality using multi-project strategies. |
title_full |
Analysing the project delay causes and improving quality using multi-project strategies. |
title_fullStr |
Analysing the project delay causes and improving quality using multi-project strategies. |
title_full_unstemmed |
Analysing the project delay causes and improving quality using multi-project strategies. |
title_sort |
analysing the project delay causes and improving quality using multi-project strategies. |
publisher |
Akademia Baru Publishing (M) Sdn. Bhd. |
publishDate |
2023 |
url |
http://eprints.utm.my/108785/1/NurAmirahSyahirahAzman2023_AnalysingtheProjectDelayCausesandImprovingQuality.pdf http://eprints.utm.my/108785/ http://dx.doi.org/10.37934/arbms.34.1.2334 |
_version_ |
1818834048579010560 |
score |
13.223943 |