Load optimisation of Multiple Boiler System (MBS) via P-graph

Multiple boiler system (MBS) is commonly applied in the industry to cater to the process steam demand reliably and flexibly. Optimising load allocation among the boilers is significant for the routine boiler system efficiency and carbon emission reduction. This aligns with the objective of "REN...

Full description

Saved in:
Bibliographic Details
Main Authors: Hong, An Er, Wan Alwi, Sharifah R., A. Manan, Zainuddin
Format: Article
Language:English
Published: Italian Association of Chemical Engineering - AIDIC 2023
Subjects:
Online Access:http://eprints.utm.my/105986/1/SharifahRadfidah2023_LoadOptimisationofMultipleBoilerSystem.pdf
http://eprints.utm.my/105986/
http://dx.doi.org/10.3303/CET23103030
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.105986
record_format eprints
spelling my.utm.1059862024-05-31T02:44:56Z http://eprints.utm.my/105986/ Load optimisation of Multiple Boiler System (MBS) via P-graph Hong, An Er Wan Alwi, Sharifah R. A. Manan, Zainuddin TP Chemical technology Multiple boiler system (MBS) is commonly applied in the industry to cater to the process steam demand reliably and flexibly. Optimising load allocation among the boilers is significant for the routine boiler system efficiency and carbon emission reduction. This aligns with the objective of "RENKEI control"to achieve the optimum cooperative energy efficiency between multiple elements that interact with one another. MBS can be implemented in a centralised or decentralised manner, depending on the unit allocation and process extension planning. Generally, the boiler load allocation is optimized via the complex engineering mathematic approach or modelling, which might not be user-friendly for the in-house engineer without sound mathematical knowledge and optimization background. Therefore, a user-friendly tool and method to handle problems of high combinatorial complexity with a low computational burden are needed. In this paper, the graph theoretic tool, Process Graph (P-graph), which was initially used for Process Network Synthesis (PNS), is applied to optimize the load allocation of both centralised and decentralised MBS considering the non-linear boiler part-load efficiency and existing steam piping network constraint. Besides, the fuel consumption by the existing on-site boiler operation strategy, such as parallel, tandem, and user-assigned mode, can be checked by simply modifying the P-graph structure to identify the potential improvement of MBS load optimization. The methodology proposed achieves 2.48 % and 2.37 % fuel savings in both centralised and decentralised MBS optimisation. Former case demonstrates a similar result (different by 0.02 %) compared to other authors' work. Italian Association of Chemical Engineering - AIDIC 2023 Article PeerReviewed application/pdf en http://eprints.utm.my/105986/1/SharifahRadfidah2023_LoadOptimisationofMultipleBoilerSystem.pdf Hong, An Er and Wan Alwi, Sharifah R. and A. Manan, Zainuddin (2023) Load optimisation of Multiple Boiler System (MBS) via P-graph. Chemical Engineering Transactions, 103 (NA). pp. 175-180. ISSN 2283-9216 http://dx.doi.org/10.3303/CET23103030 DOI : 10.3303/CET23103030
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
Hong, An Er
Wan Alwi, Sharifah R.
A. Manan, Zainuddin
Load optimisation of Multiple Boiler System (MBS) via P-graph
description Multiple boiler system (MBS) is commonly applied in the industry to cater to the process steam demand reliably and flexibly. Optimising load allocation among the boilers is significant for the routine boiler system efficiency and carbon emission reduction. This aligns with the objective of "RENKEI control"to achieve the optimum cooperative energy efficiency between multiple elements that interact with one another. MBS can be implemented in a centralised or decentralised manner, depending on the unit allocation and process extension planning. Generally, the boiler load allocation is optimized via the complex engineering mathematic approach or modelling, which might not be user-friendly for the in-house engineer without sound mathematical knowledge and optimization background. Therefore, a user-friendly tool and method to handle problems of high combinatorial complexity with a low computational burden are needed. In this paper, the graph theoretic tool, Process Graph (P-graph), which was initially used for Process Network Synthesis (PNS), is applied to optimize the load allocation of both centralised and decentralised MBS considering the non-linear boiler part-load efficiency and existing steam piping network constraint. Besides, the fuel consumption by the existing on-site boiler operation strategy, such as parallel, tandem, and user-assigned mode, can be checked by simply modifying the P-graph structure to identify the potential improvement of MBS load optimization. The methodology proposed achieves 2.48 % and 2.37 % fuel savings in both centralised and decentralised MBS optimisation. Former case demonstrates a similar result (different by 0.02 %) compared to other authors' work.
format Article
author Hong, An Er
Wan Alwi, Sharifah R.
A. Manan, Zainuddin
author_facet Hong, An Er
Wan Alwi, Sharifah R.
A. Manan, Zainuddin
author_sort Hong, An Er
title Load optimisation of Multiple Boiler System (MBS) via P-graph
title_short Load optimisation of Multiple Boiler System (MBS) via P-graph
title_full Load optimisation of Multiple Boiler System (MBS) via P-graph
title_fullStr Load optimisation of Multiple Boiler System (MBS) via P-graph
title_full_unstemmed Load optimisation of Multiple Boiler System (MBS) via P-graph
title_sort load optimisation of multiple boiler system (mbs) via p-graph
publisher Italian Association of Chemical Engineering - AIDIC
publishDate 2023
url http://eprints.utm.my/105986/1/SharifahRadfidah2023_LoadOptimisationofMultipleBoilerSystem.pdf
http://eprints.utm.my/105986/
http://dx.doi.org/10.3303/CET23103030
_version_ 1800714792930902016
score 13.160551