Technical risk mitigation framework for railway construction project in Malaysia

Railway construction projects are exposed to various risks that can cause snowball effects, which also affects the national economy. Preparing a budget for a project during the initial stage is very crucial to substantiate whether its objectives are within the financial capability. The aim of this s...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd. Kassim, Nazirul Fariq
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/id/eprint/102398/1/NazirulFariqprMohdPRAZAK2022.pdf
http://eprints.utm.my/id/eprint/102398/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:151647
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.102398
record_format eprints
spelling my.utm.1023982023-08-28T06:26:56Z http://eprints.utm.my/id/eprint/102398/ Technical risk mitigation framework for railway construction project in Malaysia Mohd. Kassim, Nazirul Fariq H Social Sciences (General) T Technology (General) Railway construction projects are exposed to various risks that can cause snowball effects, which also affects the national economy. Preparing a budget for a project during the initial stage is very crucial to substantiate whether its objectives are within the financial capability. The aim of this study is to appraise the project risk mitigation practice that impacts the cost of railway construction projects in Malaysia by four objectives: (1) identifying the impacts of cost overrun, (2) investigating the technical risks throughout the project phases, (3) assessing the technical risk factors that contribute to cost overrun, and (4) developing the technical risk mitigation framework for the railway construction project in Malaysia. This study gathered and analysed data from quantitative and qualitative methods. Research methods, such as the Average Index Method, Data Frequency Analysis, Standard Deviation, and Relative Importance Index (RII), were used in quantitative data analysis involving 200 respondents. For the first objective, this study found that the cost overrun in railway construction projects has also impacted other project elements, such as time and quality, which are grouped into short-term impacts. Meanwhile, the long-term impacts consist of a hike in the fare prices, lower ridership rate, difficulty in collecting maintenance funds, delay in enhancement and upgrading of the railway network, and high dependability on government operating subsidies. The risk assessment was conducted using the Fuzzy Synthetic Evaluation method. Results of the objectives two and three have ranked defective design, the additional scope of works, complex design of a system, error in design, and difficult construction of a system integration to be amongst 15 technical risks that are found critical in railway construction projects in Malaysia. Meanwhile, the qualitative data of the structured interview, which involved five (5) subject matter experts, were analysed using Code-Based Analysis. The results found that building information modelling (BIM), pre-fabrication, and the usage of software applications are amongst other risk response strategies in mitigating the technical risks that formed the conceptual framework. Finally, the framework had been developed for the fourth objective, which encompassed 15 critical technical risks of railway construction projects in Malaysia and 18 effective response strategies, which were categorised as to avoid, mitigate and escalate, and validated from three areas, namely acceptability, practicality, and effectiveness. Consequently, this study aligns with the Construction 4.0 Strategic Plan (20212025), Twelfth Malaysia Plan (12MP), and 2030 Agenda for Sustainable Development by United Nations (UN) in promoting resilient infrastructure, sustainable and affordable transportation, and sustainable economic growth. 2022 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/102398/1/NazirulFariqprMohdPRAZAK2022.pdf Mohd. Kassim, Nazirul Fariq (2022) Technical risk mitigation framework for railway construction project in Malaysia. PhD thesis, Universiti Teknologi Malaysia, Razak Faculty of Technology and Informatics. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:151647
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic H Social Sciences (General)
T Technology (General)
spellingShingle H Social Sciences (General)
T Technology (General)
Mohd. Kassim, Nazirul Fariq
Technical risk mitigation framework for railway construction project in Malaysia
description Railway construction projects are exposed to various risks that can cause snowball effects, which also affects the national economy. Preparing a budget for a project during the initial stage is very crucial to substantiate whether its objectives are within the financial capability. The aim of this study is to appraise the project risk mitigation practice that impacts the cost of railway construction projects in Malaysia by four objectives: (1) identifying the impacts of cost overrun, (2) investigating the technical risks throughout the project phases, (3) assessing the technical risk factors that contribute to cost overrun, and (4) developing the technical risk mitigation framework for the railway construction project in Malaysia. This study gathered and analysed data from quantitative and qualitative methods. Research methods, such as the Average Index Method, Data Frequency Analysis, Standard Deviation, and Relative Importance Index (RII), were used in quantitative data analysis involving 200 respondents. For the first objective, this study found that the cost overrun in railway construction projects has also impacted other project elements, such as time and quality, which are grouped into short-term impacts. Meanwhile, the long-term impacts consist of a hike in the fare prices, lower ridership rate, difficulty in collecting maintenance funds, delay in enhancement and upgrading of the railway network, and high dependability on government operating subsidies. The risk assessment was conducted using the Fuzzy Synthetic Evaluation method. Results of the objectives two and three have ranked defective design, the additional scope of works, complex design of a system, error in design, and difficult construction of a system integration to be amongst 15 technical risks that are found critical in railway construction projects in Malaysia. Meanwhile, the qualitative data of the structured interview, which involved five (5) subject matter experts, were analysed using Code-Based Analysis. The results found that building information modelling (BIM), pre-fabrication, and the usage of software applications are amongst other risk response strategies in mitigating the technical risks that formed the conceptual framework. Finally, the framework had been developed for the fourth objective, which encompassed 15 critical technical risks of railway construction projects in Malaysia and 18 effective response strategies, which were categorised as to avoid, mitigate and escalate, and validated from three areas, namely acceptability, practicality, and effectiveness. Consequently, this study aligns with the Construction 4.0 Strategic Plan (20212025), Twelfth Malaysia Plan (12MP), and 2030 Agenda for Sustainable Development by United Nations (UN) in promoting resilient infrastructure, sustainable and affordable transportation, and sustainable economic growth.
format Thesis
author Mohd. Kassim, Nazirul Fariq
author_facet Mohd. Kassim, Nazirul Fariq
author_sort Mohd. Kassim, Nazirul Fariq
title Technical risk mitigation framework for railway construction project in Malaysia
title_short Technical risk mitigation framework for railway construction project in Malaysia
title_full Technical risk mitigation framework for railway construction project in Malaysia
title_fullStr Technical risk mitigation framework for railway construction project in Malaysia
title_full_unstemmed Technical risk mitigation framework for railway construction project in Malaysia
title_sort technical risk mitigation framework for railway construction project in malaysia
publishDate 2022
url http://eprints.utm.my/id/eprint/102398/1/NazirulFariqprMohdPRAZAK2022.pdf
http://eprints.utm.my/id/eprint/102398/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:151647
_version_ 1775621981166632960
score 13.211869