Construction labour productivity: review of factors identified
Construction Labour Productivity (CLP) is important to the construction industry as it has a direct impact on the competitiveness of small and medium enterprises. This article’s purpose is to review the research carried out to date on identification of the factors related to CLP. A thorough literatu...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Taylor and Francis Ltd.
2022
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/101028/ http://dx.doi.org/10.1080/15623599.2019.1627503 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.101028 |
---|---|
record_format |
eprints |
spelling |
my.utm.1010282023-05-23T10:45:43Z http://eprints.utm.my/id/eprint/101028/ Construction labour productivity: review of factors identified Hamza, Mohammed Shahid, Shamsuddin Hainin, Mohd. Rosli Nashwan, Mohamed Salem TA Engineering (General). Civil engineering (General) Construction Labour Productivity (CLP) is important to the construction industry as it has a direct impact on the competitiveness of small and medium enterprises. This article’s purpose is to review the research carried out to date on identification of the factors related to CLP. A thorough literature review was conducted with all available scientific databases and a total of 88 papers were shortlisted with the keywords ‘Construction Labour Productivity’. The articles were thoroughly reviewed to identify the factors related to CLP and rank them according to their importance mentioned in different studies using Jenks classification method. The importance of CLP factors according to geographic regions was also identified. The methods used for CLP estimation from the factors are briefly discussed and finally, the recommendations for the improvement of CLP made by researchers are summarized. The finding of the study will help in understanding the directions required for better management of CLP in different geographical regions. Taylor and Francis Ltd. 2022 Article PeerReviewed Hamza, Mohammed and Shahid, Shamsuddin and Hainin, Mohd. Rosli and Nashwan, Mohamed Salem (2022) Construction labour productivity: review of factors identified. International Journal of Construction Management, 22 (3). pp. 413-425. ISSN 1562-3599 http://dx.doi.org/10.1080/15623599.2019.1627503 DOI: 10.1080/15623599.2019.1627503 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Hamza, Mohammed Shahid, Shamsuddin Hainin, Mohd. Rosli Nashwan, Mohamed Salem Construction labour productivity: review of factors identified |
description |
Construction Labour Productivity (CLP) is important to the construction industry as it has a direct impact on the competitiveness of small and medium enterprises. This article’s purpose is to review the research carried out to date on identification of the factors related to CLP. A thorough literature review was conducted with all available scientific databases and a total of 88 papers were shortlisted with the keywords ‘Construction Labour Productivity’. The articles were thoroughly reviewed to identify the factors related to CLP and rank them according to their importance mentioned in different studies using Jenks classification method. The importance of CLP factors according to geographic regions was also identified. The methods used for CLP estimation from the factors are briefly discussed and finally, the recommendations for the improvement of CLP made by researchers are summarized. The finding of the study will help in understanding the directions required for better management of CLP in different geographical regions. |
format |
Article |
author |
Hamza, Mohammed Shahid, Shamsuddin Hainin, Mohd. Rosli Nashwan, Mohamed Salem |
author_facet |
Hamza, Mohammed Shahid, Shamsuddin Hainin, Mohd. Rosli Nashwan, Mohamed Salem |
author_sort |
Hamza, Mohammed |
title |
Construction labour productivity: review of factors identified |
title_short |
Construction labour productivity: review of factors identified |
title_full |
Construction labour productivity: review of factors identified |
title_fullStr |
Construction labour productivity: review of factors identified |
title_full_unstemmed |
Construction labour productivity: review of factors identified |
title_sort |
construction labour productivity: review of factors identified |
publisher |
Taylor and Francis Ltd. |
publishDate |
2022 |
url |
http://eprints.utm.my/id/eprint/101028/ http://dx.doi.org/10.1080/15623599.2019.1627503 |
_version_ |
1768006598647611392 |
score |
13.187197 |