An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).

National Interest has never been defined clearly in the construction contract and construction industry. Perhaps, it was never discussed before. As the development surrounding and political waves are unpredictable, it is crucial to complete these studies to fill the knowledge gap. As stated clearly...

Full description

Saved in:
Bibliographic Details
Main Author: Mansor, Lydiana
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/id/eprint/100358/1/LydianaMansorMBE2022.pdf
http://eprints.utm.my/id/eprint/100358/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150224
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.100358
record_format eprints
spelling my.utm.1003582023-03-30T08:00:30Z http://eprints.utm.my/id/eprint/100358/ An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010). Mansor, Lydiana TH Building construction National Interest has never been defined clearly in the construction contract and construction industry. Perhaps, it was never discussed before. As the development surrounding and political waves are unpredictable, it is crucial to complete these studies to fill the knowledge gap. As stated clearly in Clause 52.1 (a) and (b) of the PWD Form 203A (Rev.1/2010), a government as the employer can terminate the construction contract due to National Interest. Hence, the objectives of this study are to determine what is National Interest in the termination of a government contract and also to identify a new approach to managing the termination of contractors by the Government due to National Interest in Malaysia under Clause 52.1 (a) and (b) of the PWD Form 203A (Rev.1/2010). This basic research applies the qualitative method by selecting 6 respondents based on their role, participation in the construction industry, and experience concerning construction contracts, particularly with PWD Form 203A (Rev.1/2010). Therefore through the interviews sessions conducted, it can be concluded that the government may utilize any of the suggested approaches before the termination takes place to ensure the termination due to the national interest is made fairly without any political and unnecessary intervention, which can lead to speculation made by the public and international media, that may affect the economic growth shall not be misuse or manipulate to ensure fairness and justice to all key players in the construction industry. 2022 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/100358/1/LydianaMansorMBE2022.pdf Mansor, Lydiana (2022) An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010). Masters thesis, Universiti Teknologi Malaysia. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150224
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mansor, Lydiana
An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
description National Interest has never been defined clearly in the construction contract and construction industry. Perhaps, it was never discussed before. As the development surrounding and political waves are unpredictable, it is crucial to complete these studies to fill the knowledge gap. As stated clearly in Clause 52.1 (a) and (b) of the PWD Form 203A (Rev.1/2010), a government as the employer can terminate the construction contract due to National Interest. Hence, the objectives of this study are to determine what is National Interest in the termination of a government contract and also to identify a new approach to managing the termination of contractors by the Government due to National Interest in Malaysia under Clause 52.1 (a) and (b) of the PWD Form 203A (Rev.1/2010). This basic research applies the qualitative method by selecting 6 respondents based on their role, participation in the construction industry, and experience concerning construction contracts, particularly with PWD Form 203A (Rev.1/2010). Therefore through the interviews sessions conducted, it can be concluded that the government may utilize any of the suggested approaches before the termination takes place to ensure the termination due to the national interest is made fairly without any political and unnecessary intervention, which can lead to speculation made by the public and international media, that may affect the economic growth shall not be misuse or manipulate to ensure fairness and justice to all key players in the construction industry.
format Thesis
author Mansor, Lydiana
author_facet Mansor, Lydiana
author_sort Mansor, Lydiana
title An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
title_short An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
title_full An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
title_fullStr An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
title_full_unstemmed An approach to manage termination due to national interest in clause 52.0 OF public work department form 203A (REV.1/2010).
title_sort approach to manage termination due to national interest in clause 52.0 of public work department form 203a (rev.1/2010).
publishDate 2022
url http://eprints.utm.my/id/eprint/100358/1/LydianaMansorMBE2022.pdf
http://eprints.utm.my/id/eprint/100358/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150224
_version_ 1762392193599799296
score 13.15806