Power transfer capacity improvements of existing overhead line systems
The increased demand for power transfer in combination with environmental and economic issues which set constraints to building new lines, force the implementation of new technologies into the existing system in order to improve its power capability. Such methods involve re-tensioning, re�conduc...
Saved in:
Main Authors: | Kopsidas, K., Rowland, S. M., R. Baharom, M. N., Cotton, I. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/7839/1/P8793_aea4146492c5788c7d2bd7adc98a5e3e.pdf http://eprints.uthm.edu.my/7839/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Voltage uprating of existing 275kV overhead transmission line tower for increasing the power transfer capability
by: Mat Yamin, Mohd Khairuddin
Published: (2012) -
Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
by: Baharom, Md Nor Ramdon, et al.
Published: (2015) -
Lighting performance study on existing 275KV overhead line in TNB system
by: Thamodharan, Muralitharan
Published: (2013) -
Wind-induced clearances infringement of overhead power lines
by: Abd. Malek, Zulkurnain, et al.
Published: (2014) -
Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach
by: Mahmod, Luqman Hakim
Published: (2012)