Factors affecting quality in Construction Project Life Cycle (CPLC)
Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affec...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTHM
2022
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/6884/1/J14008_2d0219de93fd745058daa90a0894723b.pdf http://eprints.uthm.edu.my/6884/ https://doi.org/10.30880/ijie.2022.14.01.030 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uthm.eprints.6884 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.68842022-04-07T02:25:20Z http://eprints.uthm.edu.my/6884/ Factors affecting quality in Construction Project Life Cycle (CPLC) Yaman, Siti Khalijah Hassan, Padzil@Fadzil Yusop, Nur Maisarah Hashim, Nur E’zzati Mohammad, Hairuddin Abu Bakar, Hasniza TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affecting construction quality was deemed essential. This even more vital given the minimal number of manuscripts looking into the matter accordingly with the generic construction project life cycle (CPLC). Thus, to operationalise the initial research, a mixed methodology endeavour was selected. This by carrying out a Multi-layered Thematic Analysis (MLTA) to determine factors affecting the quality in the CPLC and questionnaire survey to validate each factor's agreement. Through the MLTA, the results show several similarities in factors, especially in the off-site phases. Whereby in the on-site phases, factors related to 4 M's (money, material, manpower, and machinery) were found to be common. Then, through the questionnaire survey, each factor's mean and median values indicate that the majority of respondents were agreed (scale of 4 to 5) with the dedicated phase of each factor. To sum up, there is evidence that different CPLC has different factors affecting construction quality. In the current form, the findings are valuable as a basis for subsequent research undertaking, e.g. focusing on the micro perspective of quality within each phase and parties involved in the construction project. Penerbit UTHM 2022 Article PeerReviewed text en http://eprints.uthm.edu.my/6884/1/J14008_2d0219de93fd745058daa90a0894723b.pdf Yaman, Siti Khalijah and Hassan, Padzil@Fadzil and Yusop, Nur Maisarah and Hashim, Nur E’zzati and Mohammad, Hairuddin and Abu Bakar, Hasniza (2022) Factors affecting quality in Construction Project Life Cycle (CPLC). International Journal of Integrated Engineering, 14 (1). pp. 322-335. ISSN 2229-838X https://doi.org/10.30880/ijie.2022.14.01.030 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction |
spellingShingle |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Yaman, Siti Khalijah Hassan, Padzil@Fadzil Yusop, Nur Maisarah Hashim, Nur E’zzati Mohammad, Hairuddin Abu Bakar, Hasniza Factors affecting quality in Construction Project Life Cycle (CPLC) |
description |
Quality is among the critical element in managing a construction project. Unfortunately, according to
several established documents, issues related to quality in the Malaysian construction project are still rampant.
Therefore, to delve deeper into the predicament, understanding the factors affecting construction quality was
deemed essential. This even more vital given the minimal number of manuscripts looking into the matter
accordingly with the generic construction project life cycle (CPLC). Thus, to operationalise the initial research, a
mixed methodology endeavour was selected. This by carrying out a Multi-layered Thematic Analysis (MLTA) to
determine factors affecting the quality in the CPLC and questionnaire survey to validate each factor's agreement.
Through the MLTA, the results show several similarities in factors, especially in the off-site phases. Whereby in
the on-site phases, factors related to 4 M's (money, material, manpower, and machinery) were found to be
common. Then, through the questionnaire survey, each factor's mean and median values indicate that the majority
of respondents were agreed (scale of 4 to 5) with the dedicated phase of each factor. To sum up, there is evidence
that different CPLC has different factors affecting construction quality. In the current form, the findings are
valuable as a basis for subsequent research undertaking, e.g. focusing on the micro perspective of quality within
each phase and parties involved in the construction project. |
format |
Article |
author |
Yaman, Siti Khalijah Hassan, Padzil@Fadzil Yusop, Nur Maisarah Hashim, Nur E’zzati Mohammad, Hairuddin Abu Bakar, Hasniza |
author_facet |
Yaman, Siti Khalijah Hassan, Padzil@Fadzil Yusop, Nur Maisarah Hashim, Nur E’zzati Mohammad, Hairuddin Abu Bakar, Hasniza |
author_sort |
Yaman, Siti Khalijah |
title |
Factors affecting quality in Construction Project Life Cycle (CPLC) |
title_short |
Factors affecting quality in Construction Project Life Cycle (CPLC) |
title_full |
Factors affecting quality in Construction Project Life Cycle (CPLC) |
title_fullStr |
Factors affecting quality in Construction Project Life Cycle (CPLC) |
title_full_unstemmed |
Factors affecting quality in Construction Project Life Cycle (CPLC) |
title_sort |
factors affecting quality in construction project life cycle (cplc) |
publisher |
Penerbit UTHM |
publishDate |
2022 |
url |
http://eprints.uthm.edu.my/6884/1/J14008_2d0219de93fd745058daa90a0894723b.pdf http://eprints.uthm.edu.my/6884/ https://doi.org/10.30880/ijie.2022.14.01.030 |
_version_ |
1738581547501486080 |
score |
13.209306 |