Developing building information modelling (BIM) implementation model for project design team

Building Information Modelling (BIM) is implemented by the project design team to overcome the insufficiency of information in project design, which leads to design changes and design clashes. However, it seems difficult for project design team to implement BIM and get the benefits...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd, Suzila, Brahim, Juliana, Ahmad Latiffi, Aryani, Fathi, Mohamad Syazli, Harun, Aizul Nahar
Format: Article
Language:English
Published: Construction Research Institute Malaysia 2017
Subjects:
Online Access:http://eprints.uthm.edu.my/4829/1/AJ%202017%20%28668%29.pdf
http://eprints.uthm.edu.my/4829/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.4829
record_format eprints
spelling my.uthm.eprints.48292021-12-21T06:58:11Z http://eprints.uthm.edu.my/4829/ Developing building information modelling (BIM) implementation model for project design team Mohd, Suzila Brahim, Juliana Ahmad Latiffi, Aryani Fathi, Mohamad Syazli Harun, Aizul Nahar T Technology (General) TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Building Information Modelling (BIM) is implemented by the project design team to overcome the insufficiency of information in project design, which leads to design changes and design clashes. However, it seems difficult for project design team to implement BIM and get the benefits from its implementation in the project design stage because they do not know the right way to implement BIM especially to the beginner. Therefore, this paper proposes a model called ‘BIM Implementation Model for Project Design Team’. A literature review was carried out to explore on adaptation of BIM in the project design stage and types of maturity model in construction field. Apart from that, several semi-structured interviews were conducted with project design team to explore potential improvements to increase BIM implementation in project design stage. Both data from the literature review and the semi-structured interviews are important and contributed to the development of ‘BIM Implementation Model for Project Design Team’.This model is created to assist the project design team to improve the implementation of BIM in the project design stage and getting benefits from its implementation. The model purposes, the concept of the model, procedure of its development as well as details of the model elements presented in this paper will form the basis for the development of the ‘BIM Implementation Model for Project Design Team’. Construction Research Institute Malaysia 2017 Article PeerReviewed text en http://eprints.uthm.edu.my/4829/1/AJ%202017%20%28668%29.pdf Mohd, Suzila and Brahim, Juliana and Ahmad Latiffi, Aryani and Fathi, Mohamad Syazli and Harun, Aizul Nahar (2017) Developing building information modelling (BIM) implementation model for project design team. Malaysian Construction Research Journal, 1 (1). pp. 71-83. ISSN 1985-3807
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic T Technology (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
spellingShingle T Technology (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Mohd, Suzila
Brahim, Juliana
Ahmad Latiffi, Aryani
Fathi, Mohamad Syazli
Harun, Aizul Nahar
Developing building information modelling (BIM) implementation model for project design team
description Building Information Modelling (BIM) is implemented by the project design team to overcome the insufficiency of information in project design, which leads to design changes and design clashes. However, it seems difficult for project design team to implement BIM and get the benefits from its implementation in the project design stage because they do not know the right way to implement BIM especially to the beginner. Therefore, this paper proposes a model called ‘BIM Implementation Model for Project Design Team’. A literature review was carried out to explore on adaptation of BIM in the project design stage and types of maturity model in construction field. Apart from that, several semi-structured interviews were conducted with project design team to explore potential improvements to increase BIM implementation in project design stage. Both data from the literature review and the semi-structured interviews are important and contributed to the development of ‘BIM Implementation Model for Project Design Team’.This model is created to assist the project design team to improve the implementation of BIM in the project design stage and getting benefits from its implementation. The model purposes, the concept of the model, procedure of its development as well as details of the model elements presented in this paper will form the basis for the development of the ‘BIM Implementation Model for Project Design Team’.
format Article
author Mohd, Suzila
Brahim, Juliana
Ahmad Latiffi, Aryani
Fathi, Mohamad Syazli
Harun, Aizul Nahar
author_facet Mohd, Suzila
Brahim, Juliana
Ahmad Latiffi, Aryani
Fathi, Mohamad Syazli
Harun, Aizul Nahar
author_sort Mohd, Suzila
title Developing building information modelling (BIM) implementation model for project design team
title_short Developing building information modelling (BIM) implementation model for project design team
title_full Developing building information modelling (BIM) implementation model for project design team
title_fullStr Developing building information modelling (BIM) implementation model for project design team
title_full_unstemmed Developing building information modelling (BIM) implementation model for project design team
title_sort developing building information modelling (bim) implementation model for project design team
publisher Construction Research Institute Malaysia
publishDate 2017
url http://eprints.uthm.edu.my/4829/1/AJ%202017%20%28668%29.pdf
http://eprints.uthm.edu.my/4829/
_version_ 1738581303875338240
score 13.18916