The study was conducted in order to find out the implementation of Operational Readiness and Airport Transfer (ORAT) towards the new Kuala Lumpur Air Traffic Controller Centre (KL ATCC) that will restructure the Kuala Lumpur Flight Information Region (KL FIR). The study adopted a qualitative case de...

Full description

Saved in:
Bibliographic Details
Main Authors: Fairolazizi, Muhammad Aiman Zhafran, Rosly, Nurhayati, Jabbar, Balasem Abdulameer
Format: Article
Language:English
Published: FAZ Publishing 2019
Subjects:
Online Access:http://eprints.uthm.edu.my/4771/1/AJ%202020%20%2827%29.pdf
http://eprints.uthm.edu.my/4771/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.4771
record_format eprints
spelling my.uthm.eprints.47712021-12-16T05:55:20Z http://eprints.uthm.edu.my/4771/ Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC) Fairolazizi, Muhammad Aiman Zhafran Rosly, Nurhayati Jabbar, Balasem Abdulameer T Technology (General) TL500-777 Aeronautics. Aeronautical engineering The study was conducted in order to find out the implementation of Operational Readiness and Airport Transfer (ORAT) towards the new Kuala Lumpur Air Traffic Controller Centre (KL ATCC) that will restructure the Kuala Lumpur Flight Information Region (KL FIR). The study adopted a qualitative case design and will only focus on the new KL ATCC that expected to finish at the end of Year 2020. The study aimed to interpret the procedure involving ORAT operation while at the same time to investigate on the Malaysia readiness of implementing ORAT and lastly to propose suitable model to implement ORAT effectively. This research was investigated by using qualitative research techniques which questionnaires are taken and adapted as data collection instrument. Descriptive statistics such percentage and graph were used to describe the research findings. The result of this study showed that the most crucial category that need to be emphasized in ORAT element for KL ATCC is System Readiness where it was the highest concerns compared to other elements. The study concluded that Malaysia is still at a worried stage in terms of implementing ORAT because all of the categories went above 50%. So Malaysia’s government can implement ORAT for any future project that will benefit on leading to project success. FAZ Publishing 2019 Article PeerReviewed text en http://eprints.uthm.edu.my/4771/1/AJ%202020%20%2827%29.pdf Fairolazizi, Muhammad Aiman Zhafran and Rosly, Nurhayati and Jabbar, Balasem Abdulameer (2019) Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC). Journal of Aviation and Aerospace Technology, 1 (2). pp. 1-5. ISSN 2682-7433
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic T Technology (General)
TL500-777 Aeronautics. Aeronautical engineering
spellingShingle T Technology (General)
TL500-777 Aeronautics. Aeronautical engineering
Fairolazizi, Muhammad Aiman Zhafran
Rosly, Nurhayati
Jabbar, Balasem Abdulameer
Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
description The study was conducted in order to find out the implementation of Operational Readiness and Airport Transfer (ORAT) towards the new Kuala Lumpur Air Traffic Controller Centre (KL ATCC) that will restructure the Kuala Lumpur Flight Information Region (KL FIR). The study adopted a qualitative case design and will only focus on the new KL ATCC that expected to finish at the end of Year 2020. The study aimed to interpret the procedure involving ORAT operation while at the same time to investigate on the Malaysia readiness of implementing ORAT and lastly to propose suitable model to implement ORAT effectively. This research was investigated by using qualitative research techniques which questionnaires are taken and adapted as data collection instrument. Descriptive statistics such percentage and graph were used to describe the research findings. The result of this study showed that the most crucial category that need to be emphasized in ORAT element for KL ATCC is System Readiness where it was the highest concerns compared to other elements. The study concluded that Malaysia is still at a worried stage in terms of implementing ORAT because all of the categories went above 50%. So Malaysia’s government can implement ORAT for any future project that will benefit on leading to project success.
format Article
author Fairolazizi, Muhammad Aiman Zhafran
Rosly, Nurhayati
Jabbar, Balasem Abdulameer
author_facet Fairolazizi, Muhammad Aiman Zhafran
Rosly, Nurhayati
Jabbar, Balasem Abdulameer
author_sort Fairolazizi, Muhammad Aiman Zhafran
title Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
title_short Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
title_full Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
title_fullStr Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
title_full_unstemmed Operational readiness and airport transfer (ORAT) of Kuala Lumpur air traffic control centre (KL ATCC)
title_sort operational readiness and airport transfer (orat) of kuala lumpur air traffic control centre (kl atcc)
publisher FAZ Publishing
publishDate 2019
url http://eprints.uthm.edu.my/4771/1/AJ%202020%20%2827%29.pdf
http://eprints.uthm.edu.my/4771/
_version_ 1738581296567812096
score 13.18916