Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry

Generally, the used of Industrialised Building System (IBS) in construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, Construction Industry Development Board (CIDB) has been actively promoting the use of Industria...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Zawawi, Mardhiah
التنسيق: أطروحة
اللغة:English
منشور في: 2009
الموضوعات:
الوصول للمادة أونلاين:http://eprints.uthm.edu.my/3788/1/24p%20MARDHIAH%20ZAWAWI.pdf
http://eprints.uthm.edu.my/3788/
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my.uthm.eprints.3788
record_format eprints
spelling my.uthm.eprints.37882022-02-03T01:59:49Z http://eprints.uthm.edu.my/3788/ Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry Zawawi, Mardhiah TH Building construction TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Generally, the used of Industrialised Building System (IBS) in construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, the used of IBS for building project in Malaysia is still limited if compared to CIDB's target. In view to this limitation, this study has been carried out to evaluate the effectiveness of current IBS implementation for Malaysian construction industry through the measurement of acceptance level on the current IBS implementation and also determination of the existing problems faced by construction industry related to the IBS implementation. The methodologies adopted for this study are interview with expert panels and questionnaire survey. The result of this study revealed that current promotion on IBS for awareness purposes is effective but unfortunately the application is still very limited since it only covers certain elements. Not all practitioners can accept it implementation especially company and personnel with less experiences in handling IBS project. It is recommended that the relevant institution which produce young engineer for construction sector must provide a syllabus on IBS which cover technical, business process, and all aspect which needed for effective IBS implementation. This can generates wider range of application of IBS product within the industry 2009-11 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/3788/1/24p%20MARDHIAH%20ZAWAWI.pdf Zawawi, Mardhiah (2009) Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry. Masters thesis, Universiti Teknologi Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic TH Building construction
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
spellingShingle TH Building construction
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Zawawi, Mardhiah
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
description Generally, the used of Industrialised Building System (IBS) in construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialised Building System (IBS) in Malaysian Construction Industry since 1998. Unfortunately, the used of IBS for building project in Malaysia is still limited if compared to CIDB's target. In view to this limitation, this study has been carried out to evaluate the effectiveness of current IBS implementation for Malaysian construction industry through the measurement of acceptance level on the current IBS implementation and also determination of the existing problems faced by construction industry related to the IBS implementation. The methodologies adopted for this study are interview with expert panels and questionnaire survey. The result of this study revealed that current promotion on IBS for awareness purposes is effective but unfortunately the application is still very limited since it only covers certain elements. Not all practitioners can accept it implementation especially company and personnel with less experiences in handling IBS project. It is recommended that the relevant institution which produce young engineer for construction sector must provide a syllabus on IBS which cover technical, business process, and all aspect which needed for effective IBS implementation. This can generates wider range of application of IBS product within the industry
format Thesis
author Zawawi, Mardhiah
author_facet Zawawi, Mardhiah
author_sort Zawawi, Mardhiah
title Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
title_short Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
title_full Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
title_fullStr Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
title_full_unstemmed Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
title_sort effectiveness of industrialised building system (ibs) implementation for malaysian construction industry
publishDate 2009
url http://eprints.uthm.edu.my/3788/1/24p%20MARDHIAH%20ZAWAWI.pdf
http://eprints.uthm.edu.my/3788/
_version_ 1738581168522002432
score 13.154949