Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges

The application of lean management is able to improve construction processes. Unnecessary waiting time, overstaffing and risk uncertainty are some of the problems that can be eliminated by adopting lean management. Industrialised Building System (IBS) is a sustainable approach that can be improved c...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Noor, Siti Rahimah, Yunus, Riduan, Abdullah, Abd Halid, Nagapan, Sasitharan, Syahir Syed Mazlan, Syed Mohamad
Format: Article
Published: Science Publishing Corporation 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/3773/
https://doi.org/10.14419/ijet.v7i3.23.17253
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.3773
record_format eprints
spelling my.uthm.eprints.37732021-11-22T02:49:57Z http://eprints.uthm.edu.my/3773/ Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges Mohd Noor, Siti Rahimah Yunus, Riduan Abdullah, Abd Halid Nagapan, Sasitharan Syahir Syed Mazlan, Syed Mohamad TH Building construction TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction The application of lean management is able to improve construction processes. Unnecessary waiting time, overstaffing and risk uncertainty are some of the problems that can be eliminated by adopting lean management. Industrialised Building System (IBS) is a sustainable approach that can be improved construction deliverables with the integration of lean management. However, the adoption or practice of lean management in productions of IBS component productions is still limited. There are only few studies emphases on the interactions among key drivers and hierarchy of lean management key drivers model. This study used Interpretive Structural Modeling (ISM) to interpret relationship of drivers and challenges in integrating lean management in form of ISM based-model and Matrice d’impacts croisés multiplication appliquée an classment (MICMAC). The results from this will improve the adoption of lean management in IBS application. Science Publishing Corporation 2018 Article PeerReviewed Mohd Noor, Siti Rahimah and Yunus, Riduan and Abdullah, Abd Halid and Nagapan, Sasitharan and Syahir Syed Mazlan, Syed Mohamad (2018) Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges. International Journal of Engineering & Technology, 7 (3.23). pp. 22-31. ISSN 2227-524X https://doi.org/10.14419/ijet.v7i3.23.17253
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
topic TH Building construction
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
spellingShingle TH Building construction
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Mohd Noor, Siti Rahimah
Yunus, Riduan
Abdullah, Abd Halid
Nagapan, Sasitharan
Syahir Syed Mazlan, Syed Mohamad
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
description The application of lean management is able to improve construction processes. Unnecessary waiting time, overstaffing and risk uncertainty are some of the problems that can be eliminated by adopting lean management. Industrialised Building System (IBS) is a sustainable approach that can be improved construction deliverables with the integration of lean management. However, the adoption or practice of lean management in productions of IBS component productions is still limited. There are only few studies emphases on the interactions among key drivers and hierarchy of lean management key drivers model. This study used Interpretive Structural Modeling (ISM) to interpret relationship of drivers and challenges in integrating lean management in form of ISM based-model and Matrice d’impacts croisés multiplication appliquée an classment (MICMAC). The results from this will improve the adoption of lean management in IBS application.
format Article
author Mohd Noor, Siti Rahimah
Yunus, Riduan
Abdullah, Abd Halid
Nagapan, Sasitharan
Syahir Syed Mazlan, Syed Mohamad
author_facet Mohd Noor, Siti Rahimah
Yunus, Riduan
Abdullah, Abd Halid
Nagapan, Sasitharan
Syahir Syed Mazlan, Syed Mohamad
author_sort Mohd Noor, Siti Rahimah
title Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
title_short Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
title_full Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
title_fullStr Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
title_full_unstemmed Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
title_sort insights into the adoption of lean management in industrialised building system (ibs) implementation: the drivers and challenges
publisher Science Publishing Corporation
publishDate 2018
url http://eprints.uthm.edu.my/3773/
https://doi.org/10.14419/ijet.v7i3.23.17253
_version_ 1738581166827503616
score 13.18916