Schedule based material requirements planning: a case study of LCD TV manufacturer
The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, q...
Saved in:
Main Authors: | Cheam, Kai Wen, Mohd Nor, Norasmiha, Shahkirin, Ahmad Haiqal, Jaafar, Muhamad Zamakhsyari, Mhd Zamaludin, Nabilah Afrina, Misnan, Nur Aini Nasihah |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Penerbit UTHM
2020
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3205/1/Ch01.pdf http://eprints.uthm.edu.my/3205/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Material requirements planning system: a case study of stationery manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Furniture inventory control: using material requirement planning
by: Mohd Nor, Norasmiha, et al.
Published: (2020) -
The material requirements planning system for vacuum manufacturer
by: Mohd Nor, Norasmiha, et al.
Published: (2020) -
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Material requirements planning: application in small medium enterprise
by: Mohd Nor, Norasmiha, et al.
Published: (2020)