A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry

Design and build procurement approach is being considered as one of the innovative procurement approaches that is widely gaining popularity globally. The Malaysian construction industry is not left out in the growing adoption of this procurement approach, this could be attributed to the several a...

Full description

Saved in:
Bibliographic Details
Main Author: Gambo, Muhammad Mustapha
Format: Thesis
Language:English
English
English
Published: 2011
Subjects:
Online Access:http://eprints.uthm.edu.my/2729/1/24p%20MUHAMMAD%20MUSTAPHA%20GAMBO.pdf
http://eprints.uthm.edu.my/2729/2/MUHAMMAD%20MUSTAPHA%20GAMBO%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2729/3/MUHAMMAD%20MUSTAPHA%20GAMBO%20WATERMARK.pdf
http://eprints.uthm.edu.my/2729/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.2729
record_format eprints
spelling my.uthm.eprints.27292021-11-01T06:17:09Z http://eprints.uthm.edu.my/2729/ A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry Gambo, Muhammad Mustapha TH Building construction Design and build procurement approach is being considered as one of the innovative procurement approaches that is widely gaining popularity globally. The Malaysian construction industry is not left out in the growing adoption of this procurement approach, this could be attributed to the several advantages that the system offers to construction clients which includes single point responsibility, fixed cost, shortened project duration and risk allocation. However, with all these inherent advantages of the procurement approach, it is yet to be effectively adopted and practiced in the Malaysian construction industry. This study is aimed at appraising the Design &Build (D&B) procurement approach in the Malaysian Construction Industry based on current practice through identifying the impeding and enabling factors to the achievement of the client‟s specific expectations in order to enable the better practice of D&B procurement approach in the industry. Data was collected from a two round Delphi questionnaire survey which was conducted in Malaysia in order to identify the features that characterize the D&B procurement approach, and also the impeding and enabling factors in the achievement of the client‟s specific expectations. The key findings in the study showed that the practice of the system in Malaysia is most importantly characterized by the fact that the system is most suitable for projects that are complex in nature. Whilst the impeding and enabling factors in the achievement of the client‟s specific expectations which are attributed to be client related, contractor related and also external environment related was determined. It is expected that with the consideration of these impeding and enabling factors to the achievement of the client specific expectations, it will consequently result in the enhanced D&B project delivery, the better practice of the procurement approach; and ultimately the overall improvement of the performance of the Malaysian construction industry in relation to D&B projects. 2011-06 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/2729/1/24p%20MUHAMMAD%20MUSTAPHA%20GAMBO.pdf text en http://eprints.uthm.edu.my/2729/2/MUHAMMAD%20MUSTAPHA%20GAMBO%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/2729/3/MUHAMMAD%20MUSTAPHA%20GAMBO%20WATERMARK.pdf Gambo, Muhammad Mustapha (2011) A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry. Masters thesis, Universiti Tun Hussein Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
English
English
topic TH Building construction
spellingShingle TH Building construction
Gambo, Muhammad Mustapha
A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
description Design and build procurement approach is being considered as one of the innovative procurement approaches that is widely gaining popularity globally. The Malaysian construction industry is not left out in the growing adoption of this procurement approach, this could be attributed to the several advantages that the system offers to construction clients which includes single point responsibility, fixed cost, shortened project duration and risk allocation. However, with all these inherent advantages of the procurement approach, it is yet to be effectively adopted and practiced in the Malaysian construction industry. This study is aimed at appraising the Design &Build (D&B) procurement approach in the Malaysian Construction Industry based on current practice through identifying the impeding and enabling factors to the achievement of the client‟s specific expectations in order to enable the better practice of D&B procurement approach in the industry. Data was collected from a two round Delphi questionnaire survey which was conducted in Malaysia in order to identify the features that characterize the D&B procurement approach, and also the impeding and enabling factors in the achievement of the client‟s specific expectations. The key findings in the study showed that the practice of the system in Malaysia is most importantly characterized by the fact that the system is most suitable for projects that are complex in nature. Whilst the impeding and enabling factors in the achievement of the client‟s specific expectations which are attributed to be client related, contractor related and also external environment related was determined. It is expected that with the consideration of these impeding and enabling factors to the achievement of the client specific expectations, it will consequently result in the enhanced D&B project delivery, the better practice of the procurement approach; and ultimately the overall improvement of the performance of the Malaysian construction industry in relation to D&B projects.
format Thesis
author Gambo, Muhammad Mustapha
author_facet Gambo, Muhammad Mustapha
author_sort Gambo, Muhammad Mustapha
title A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
title_short A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
title_full A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
title_fullStr A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
title_full_unstemmed A study of current design & build procurement approach practice based on the client‟s specific expectations in the Malaysian Construction Industry
title_sort study of current design & build procurement approach practice based on the client‟s specific expectations in the malaysian construction industry
publishDate 2011
url http://eprints.uthm.edu.my/2729/1/24p%20MUHAMMAD%20MUSTAPHA%20GAMBO.pdf
http://eprints.uthm.edu.my/2729/2/MUHAMMAD%20MUSTAPHA%20GAMBO%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2729/3/MUHAMMAD%20MUSTAPHA%20GAMBO%20WATERMARK.pdf
http://eprints.uthm.edu.my/2729/
_version_ 1738581028256088064
score 13.18916