Development of a building information modelling (BIM) migration path model for construction professionals

The construction professionals have the notion that by implementing Building Information Modelling (BIM) in construction could overcome problems such as delay, cost overrun, clashes in project design and undesirable quality in construction. However, they failed to take the advantages of the BIM b...

Full description

Saved in:
Bibliographic Details
Main Author: Brahim, Juliana
Format: Thesis
Language:English
English
English
Published: 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/197/1/24p%20JULIANA%20BRAHIM.pdf
http://eprints.uthm.edu.my/197/2/JULIANA%20BRAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/197/3/JULIANA%20BRAHIM%20WATERMARK.pdf
http://eprints.uthm.edu.my/197/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.197
record_format eprints
spelling my.uthm.eprints.1972021-07-06T08:00:13Z http://eprints.uthm.edu.my/197/ Development of a building information modelling (BIM) migration path model for construction professionals Brahim, Juliana TH Building construction TH4021-4977 Buildings: Construction with reference to use. Including public buildings, dwellings The construction professionals have the notion that by implementing Building Information Modelling (BIM) in construction could overcome problems such as delay, cost overrun, clashes in project design and undesirable quality in construction. However, they failed to take the advantages of the BIM benefit as they are still trying to find the best way to take on board the BIM into current practices. Most of the professionals do not know ‘when’ and ‘how’ to apply BIM throughout the construction lifecycle. Several research models related to BIM has been developed to improve and encourage BIM implementation. Nevertheless, the developed models have limitations in highlighting the steps involved that could assist the construction professionals in implementing BIM effectively in Malaysia. Therefore, this research is aimed to develop a model that would be able to assist Malaysian construction professionals in implementing BIM in a structured way. A semi-structured interview was carried out with respondents that have various experienced and currently involved in BIM projects in the Malaysian construction industry. Findings show that the construction professionals are lacking in knowledge and experience in using BIM in various stages of construction. Thus, they were unable to fully capitalise the benefit of 3D models. Migration path model was proposed and evaluated as a strategic approach for BIM implementation in the Malaysian construction industry. The identification of five (5) activities (BIM Awareness, Develop BIM Strategy, Implement BIM, Monitor BIM and Expand BIM Implementation) with the three (3) enablers (BIM work contract, BIM work process and BIM technology) in the model is expected to be able to assist construction professionals to implement BIM with the right BIM concept and later, the benefit could be obtained for improving construction project. The proposed model could be as a guideline for construction professionals in implementing BIM, specifically in countries that new in BIM. The model is also expected to be able to fill the gap in BIM implementation by supporting the initiatives by the Malaysian government for increasing productivity in construction projects by using new technology like BIM. 2018-07 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/197/1/24p%20JULIANA%20BRAHIM.pdf text en http://eprints.uthm.edu.my/197/2/JULIANA%20BRAHIM%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/197/3/JULIANA%20BRAHIM%20WATERMARK.pdf Brahim, Juliana (2018) Development of a building information modelling (BIM) migration path model for construction professionals. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
English
English
topic TH Building construction
TH4021-4977 Buildings: Construction with reference to use. Including public buildings, dwellings
spellingShingle TH Building construction
TH4021-4977 Buildings: Construction with reference to use. Including public buildings, dwellings
Brahim, Juliana
Development of a building information modelling (BIM) migration path model for construction professionals
description The construction professionals have the notion that by implementing Building Information Modelling (BIM) in construction could overcome problems such as delay, cost overrun, clashes in project design and undesirable quality in construction. However, they failed to take the advantages of the BIM benefit as they are still trying to find the best way to take on board the BIM into current practices. Most of the professionals do not know ‘when’ and ‘how’ to apply BIM throughout the construction lifecycle. Several research models related to BIM has been developed to improve and encourage BIM implementation. Nevertheless, the developed models have limitations in highlighting the steps involved that could assist the construction professionals in implementing BIM effectively in Malaysia. Therefore, this research is aimed to develop a model that would be able to assist Malaysian construction professionals in implementing BIM in a structured way. A semi-structured interview was carried out with respondents that have various experienced and currently involved in BIM projects in the Malaysian construction industry. Findings show that the construction professionals are lacking in knowledge and experience in using BIM in various stages of construction. Thus, they were unable to fully capitalise the benefit of 3D models. Migration path model was proposed and evaluated as a strategic approach for BIM implementation in the Malaysian construction industry. The identification of five (5) activities (BIM Awareness, Develop BIM Strategy, Implement BIM, Monitor BIM and Expand BIM Implementation) with the three (3) enablers (BIM work contract, BIM work process and BIM technology) in the model is expected to be able to assist construction professionals to implement BIM with the right BIM concept and later, the benefit could be obtained for improving construction project. The proposed model could be as a guideline for construction professionals in implementing BIM, specifically in countries that new in BIM. The model is also expected to be able to fill the gap in BIM implementation by supporting the initiatives by the Malaysian government for increasing productivity in construction projects by using new technology like BIM.
format Thesis
author Brahim, Juliana
author_facet Brahim, Juliana
author_sort Brahim, Juliana
title Development of a building information modelling (BIM) migration path model for construction professionals
title_short Development of a building information modelling (BIM) migration path model for construction professionals
title_full Development of a building information modelling (BIM) migration path model for construction professionals
title_fullStr Development of a building information modelling (BIM) migration path model for construction professionals
title_full_unstemmed Development of a building information modelling (BIM) migration path model for construction professionals
title_sort development of a building information modelling (bim) migration path model for construction professionals
publishDate 2018
url http://eprints.uthm.edu.my/197/1/24p%20JULIANA%20BRAHIM.pdf
http://eprints.uthm.edu.my/197/2/JULIANA%20BRAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/197/3/JULIANA%20BRAHIM%20WATERMARK.pdf
http://eprints.uthm.edu.my/197/
_version_ 1738580706652585984
score 13.154949