Study on mitigation factors for controlling cost overrun in construction project
The construction industry plays an influential role in the socio-economy of a country. In Malaysia also, the construction industry is one of essential industry participating significantly in the growth of socio-economic development. The construction industry in Malaysia are still facing a sign...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1184/1/24p%20FATEHI%20MANSOOR%20SAAD%20ABDULLAH.pdf http://eprints.uthm.edu.my/1184/3/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1184/2/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20WATERMARK.pdf http://eprints.uthm.edu.my/1184/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uthm.eprints.1184 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.11842021-09-30T06:27:56Z http://eprints.uthm.edu.my/1184/ Study on mitigation factors for controlling cost overrun in construction project Abdullah, Fatehi Mansoor Saad TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction The construction industry plays an influential role in the socio-economy of a country. In Malaysia also, the construction industry is one of essential industry participating significantly in the growth of socio-economic development. The construction industry in Malaysia are still facing a significant issue of cost overrun, where only 46.8% of public sector and 37.2% of private sector projects were completed within the specified budget. The issue of cost overrun has become a serious concern to investors, which needs stern attention and in-depth research to put forward solutions to this issue. The objectives of this research are to investigate current mitigation practices for controlling cost overrun in construction projects, to identify mitigation problems for controlling cost overrun in construction projects and to recommend key mitigation factors for controlling cost overrun in construction projects. The research was take place in Johor Bahru the capital of Johor State. The research based on quantitative research by using questionnaire to carry out the research. The questionnaire was designed based on the objectives each objective has ten statements with one option, in order to get accuracy results. A total of 80 questionnaires were gathered from a total of 220 contractors of G7 distributed at Johor Bahru. Data collected was analysed using the Statistical Package for the Social Science 22.0 software. The method of analysis that had being used in this research is percentage, frequency and means score value. There is dissatisfaction about the current mitigation practices for controlling cost overrun. Moreover, the study proves that there are mitigation problems faced by contractors. Furthermore, majority of the respondents agreed to the recommendation provided by the study to control cost overrun. Respondents have been recommended that may will be effectiveness to keep construction project within budget. In conclusion, the research has been introduced and recommended major mitigation factors for controlling cost overrun may will help construction industry achieve project within budget. 2018-09 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1184/1/24p%20FATEHI%20MANSOOR%20SAAD%20ABDULLAH.pdf text en http://eprints.uthm.edu.my/1184/3/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1184/2/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20WATERMARK.pdf Abdullah, Fatehi Mansoor Saad (2018) Study on mitigation factors for controlling cost overrun in construction project. Masters thesis, Universiti Tun Hussein Onn Malaysia. |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English English English |
topic |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction |
spellingShingle |
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Abdullah, Fatehi Mansoor Saad Study on mitigation factors for controlling cost overrun in construction project |
description |
The construction industry plays an influential role in the socio-economy of a country.
In Malaysia also, the construction industry is one of essential industry participating
significantly in the growth of socio-economic development. The construction industry
in Malaysia are still facing a significant issue of cost overrun, where only 46.8% of
public sector and 37.2% of private sector projects were completed within the specified
budget. The issue of cost overrun has become a serious concern to investors, which
needs stern attention and in-depth research to put forward solutions to this issue. The
objectives of this research are to investigate current mitigation practices for controlling
cost overrun in construction projects, to identify mitigation problems for controlling
cost overrun in construction projects and to recommend key mitigation factors for
controlling cost overrun in construction projects. The research was take place in Johor
Bahru the capital of Johor State. The research based on quantitative research by using
questionnaire to carry out the research. The questionnaire was designed based on the
objectives each objective has ten statements with one option, in order to get accuracy
results. A total of 80 questionnaires were gathered from a total of 220 contractors of
G7 distributed at Johor Bahru. Data collected was analysed using the Statistical
Package for the Social Science 22.0 software. The method of analysis that had being
used in this research is percentage, frequency and means score value. There is
dissatisfaction about the current mitigation practices for controlling cost overrun.
Moreover, the study proves that there are mitigation problems faced by contractors.
Furthermore, majority of the respondents agreed to the recommendation provided by
the study to control cost overrun. Respondents have been recommended that may will
be effectiveness to keep construction project within budget. In conclusion, the research
has been introduced and recommended major mitigation factors for controlling cost
overrun may will help construction industry achieve project within budget. |
format |
Thesis |
author |
Abdullah, Fatehi Mansoor Saad |
author_facet |
Abdullah, Fatehi Mansoor Saad |
author_sort |
Abdullah, Fatehi Mansoor Saad |
title |
Study on mitigation factors for controlling cost overrun in construction project |
title_short |
Study on mitigation factors for controlling cost overrun in construction project |
title_full |
Study on mitigation factors for controlling cost overrun in construction project |
title_fullStr |
Study on mitigation factors for controlling cost overrun in construction project |
title_full_unstemmed |
Study on mitigation factors for controlling cost overrun in construction project |
title_sort |
study on mitigation factors for controlling cost overrun in construction project |
publishDate |
2018 |
url |
http://eprints.uthm.edu.my/1184/1/24p%20FATEHI%20MANSOOR%20SAAD%20ABDULLAH.pdf http://eprints.uthm.edu.my/1184/3/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1184/2/FATEHI%20MANSOOR%20SAAD%20ABDULLAH%20WATERMARK.pdf http://eprints.uthm.edu.my/1184/ |
_version_ |
1738580830407622656 |
score |
13.209306 |