Fast multi-period economic dispatch for large-scale power systems

This paper presents optimized multi-period economic dispatch solution for large-scale power system operations. The purpose is to achieve the required minimization of the operation cost of power generating units. Linear Programming, LaGrange Relaxation and Branch and Bound Methods were used. The comb...

Full description

Saved in:
Bibliographic Details
Main Author: Ab Ghani, Mohd Ruddin
Format: Article
Language:English
Published: Illinois Inst of Technology, Chicago,m IL, USA 1999
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/9259/1/P33.pdf
http://eprints.utem.edu.my/id/eprint/9259/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.9259
record_format eprints
spelling my.utem.eprints.92592021-09-01T21:08:41Z http://eprints.utem.edu.my/id/eprint/9259/ Fast multi-period economic dispatch for large-scale power systems Ab Ghani, Mohd Ruddin TK Electrical engineering. Electronics Nuclear engineering This paper presents optimized multi-period economic dispatch solution for large-scale power system operations. The purpose is to achieve the required minimization of the operation cost of power generating units. Linear Programming, LaGrange Relaxation and Branch and Bound Methods were used. The combined algorithms used appear to be fast enough to meet the computation resource requirement of the system and to minimize the operating cost of generation units. An economic load dispatch with six period intervals has been formulated and successfully completed. The results found from the algorithm appears to be modest in both optimizing the operation cost and achieving fast computation time of dynamic economic load dispatch system Illinois Inst of Technology, Chicago,m IL, USA 1999 Article PeerReviewed text en http://eprints.utem.edu.my/id/eprint/9259/1/P33.pdf Ab Ghani, Mohd Ruddin (1999) Fast multi-period economic dispatch for large-scale power systems. Proceedings of the American Power Conference, 61 (-). pp. 382-387. ISSN 00972126
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Ab Ghani, Mohd Ruddin
Fast multi-period economic dispatch for large-scale power systems
description This paper presents optimized multi-period economic dispatch solution for large-scale power system operations. The purpose is to achieve the required minimization of the operation cost of power generating units. Linear Programming, LaGrange Relaxation and Branch and Bound Methods were used. The combined algorithms used appear to be fast enough to meet the computation resource requirement of the system and to minimize the operating cost of generation units. An economic load dispatch with six period intervals has been formulated and successfully completed. The results found from the algorithm appears to be modest in both optimizing the operation cost and achieving fast computation time of dynamic economic load dispatch system
format Article
author Ab Ghani, Mohd Ruddin
author_facet Ab Ghani, Mohd Ruddin
author_sort Ab Ghani, Mohd Ruddin
title Fast multi-period economic dispatch for large-scale power systems
title_short Fast multi-period economic dispatch for large-scale power systems
title_full Fast multi-period economic dispatch for large-scale power systems
title_fullStr Fast multi-period economic dispatch for large-scale power systems
title_full_unstemmed Fast multi-period economic dispatch for large-scale power systems
title_sort fast multi-period economic dispatch for large-scale power systems
publisher Illinois Inst of Technology, Chicago,m IL, USA
publishDate 1999
url http://eprints.utem.edu.my/id/eprint/9259/1/P33.pdf
http://eprints.utem.edu.my/id/eprint/9259/
_version_ 1710679410562039808
score 13.15806