Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill

Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept th...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Jamadeel Izwan
Format: Thesis
Language:English
English
Published: 2019
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117929
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.25514
record_format eprints
spelling my.utem.eprints.255142022-01-06T12:07:38Z http://eprints.utem.edu.my/id/eprint/25514/ Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill Ibrahim, Jamadeel Izwan T Technology (General) TS Manufactures Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept that can save cost, time and energy. It is undeniable that machines have contributed a lot to increasing productivity, but if it is not well-maintained, it will not serve the purpose. This study emphasizes reducing the downtime in Kilang Sawit Kota Bahagia (KSKB) Palm Oil Mill caused by the breakdown of the production. The downtime data for the year 2017 showed that downtime has increased from January until December especially during the months of July, August, October and November where the hours of downtime were 10, 15.5, 15 and 15 hours respectively . The objective of this study is to identify the potential causes of the downtime by using the Ishikawa Diagram and Pareto Chart. Additionally, the performance of the machines related was assessed using Overall Equipment Effectiveness (OEE) Analysis. The Total Productive Maintenance (TPM) method was proposed to overcome the downtime problem with the implementation of S, Planned Maintenance and Autonomous Maintenance for two months of the trial period. Finally, the proposed method was evaluated and the result indicated that there was an increment of machine’s OEE for example; screw press machines from 6.4% to 30.5%. 2019 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf text en http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf Ibrahim, Jamadeel Izwan (2019) Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117929
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
English
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Ibrahim, Jamadeel Izwan
Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
description Every company, be it manufacturing or service-oriented will be looking for its best ways to improve profits without increasing the business capital. The management team will work at their best to think and execute any alternatives that can increase productivity at the same time having the concept that can save cost, time and energy. It is undeniable that machines have contributed a lot to increasing productivity, but if it is not well-maintained, it will not serve the purpose. This study emphasizes reducing the downtime in Kilang Sawit Kota Bahagia (KSKB) Palm Oil Mill caused by the breakdown of the production. The downtime data for the year 2017 showed that downtime has increased from January until December especially during the months of July, August, October and November where the hours of downtime were 10, 15.5, 15 and 15 hours respectively . The objective of this study is to identify the potential causes of the downtime by using the Ishikawa Diagram and Pareto Chart. Additionally, the performance of the machines related was assessed using Overall Equipment Effectiveness (OEE) Analysis. The Total Productive Maintenance (TPM) method was proposed to overcome the downtime problem with the implementation of S, Planned Maintenance and Autonomous Maintenance for two months of the trial period. Finally, the proposed method was evaluated and the result indicated that there was an increment of machine’s OEE for example; screw press machines from 6.4% to 30.5%.
format Thesis
author Ibrahim, Jamadeel Izwan
author_facet Ibrahim, Jamadeel Izwan
author_sort Ibrahim, Jamadeel Izwan
title Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_short Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_full Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_fullStr Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_full_unstemmed Proposal Of Effective Maintenance Plan For Enhancing Overall Equipment Effectiveness At Palm Oil Mill
title_sort proposal of effective maintenance plan for enhancing overall equipment effectiveness at palm oil mill
publishDate 2019
url http://eprints.utem.edu.my/id/eprint/25514/1/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/2/Proposal%20Of%20Effective%20Maintenance%20Plan%20For%20Enhancing%20Overall%20Equipment%20Effectiveness%20At%20Palm%20Oil%20Mill.pdf
http://eprints.utem.edu.my/id/eprint/25514/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=117929
_version_ 1724077899028365312
score 13.18916