Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping

This study aims to determine the manner in which the Cleaner Production (CP) sustainability measures would be embedded into the altered Value Stream Mapping (VSM), which is a Lean Manufacturing tool. The typical VSM technique does not consider the societal and the environmental metrics that are impe...

Full description

Saved in:
Bibliographic Details
Main Authors: Ishak, Anuar, Mohamad, Effendi, Sukarma, Lukman, Salleh, Mohd Shukor, Salleh, Mohd Rizal, Mohamad, Noraiham, Raja Abdullah, Raja Izamshah, Md Ali, Mohd Amran
Format: Article
Language:English
Published: Penerbit Universiti, UTeM 2018
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/22844/2/4269-12052-1-PB1.pdf
http://eprints.utem.edu.my/id/eprint/22844/
http://journal.utem.edu.my/index.php/jamt/article/view/4269/3372
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.22844
record_format eprints
spelling my.utem.eprints.228442021-08-24T13:36:11Z http://eprints.utem.edu.my/id/eprint/22844/ Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping Ishak, Anuar Mohamad, Effendi Sukarma, Lukman Salleh, Mohd Shukor Salleh, Mohd Rizal Mohamad, Noraiham Raja Abdullah, Raja Izamshah Md Ali, Mohd Amran T Technology (General) TS Manufactures This study aims to determine the manner in which the Cleaner Production (CP) sustainability measures would be embedded into the altered Value Stream Mapping (VSM), which is a Lean Manufacturing tool. The typical VSM technique does not consider the societal and the environmental metrics that are imperative for determining the sustainability for any production line. Additionally, the Guidelines for Green Industry Auditor, 2014, published by the Department of Environment, Malaysia, have made no mention regarding the proper lean tools which need to be applied to the audit systems as per the USEPA for improving the system. The VSM ability to determine the environmental, economic and societal performance would help VSM be a useful tool. Also, many companies can apply the data generated in a better manner and change their operations to fit the technology for improving the manufacturing. This paper has presented a CP implementation with the help of a VSM technology, based on the earlier literature. One pilot case study has been conducted in the local e-Waste Recovery Plant, ABC Sdn. Bhd., which demonstrated that this VSM approach, could capture the environmental, economic and societal sustainability for a specific process and has also, recommended some future researches. Penerbit Universiti, UTeM 2018 Article PeerReviewed text en http://eprints.utem.edu.my/id/eprint/22844/2/4269-12052-1-PB1.pdf Ishak, Anuar and Mohamad, Effendi and Sukarma, Lukman and Salleh, Mohd Shukor and Salleh, Mohd Rizal and Mohamad, Noraiham and Raja Abdullah, Raja Izamshah and Md Ali, Mohd Amran (2018) Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping. Journal Of Advanced Manufacturing Technology (JAMT) , 12 (1 (2)). pp. 55-67. ISSN 1985-3157 (Unpublished) http://journal.utem.edu.my/index.php/jamt/article/view/4269/3372
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Ishak, Anuar
Mohamad, Effendi
Sukarma, Lukman
Salleh, Mohd Shukor
Salleh, Mohd Rizal
Mohamad, Noraiham
Raja Abdullah, Raja Izamshah
Md Ali, Mohd Amran
Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
description This study aims to determine the manner in which the Cleaner Production (CP) sustainability measures would be embedded into the altered Value Stream Mapping (VSM), which is a Lean Manufacturing tool. The typical VSM technique does not consider the societal and the environmental metrics that are imperative for determining the sustainability for any production line. Additionally, the Guidelines for Green Industry Auditor, 2014, published by the Department of Environment, Malaysia, have made no mention regarding the proper lean tools which need to be applied to the audit systems as per the USEPA for improving the system. The VSM ability to determine the environmental, economic and societal performance would help VSM be a useful tool. Also, many companies can apply the data generated in a better manner and change their operations to fit the technology for improving the manufacturing. This paper has presented a CP implementation with the help of a VSM technology, based on the earlier literature. One pilot case study has been conducted in the local e-Waste Recovery Plant, ABC Sdn. Bhd., which demonstrated that this VSM approach, could capture the environmental, economic and societal sustainability for a specific process and has also, recommended some future researches.
format Article
author Ishak, Anuar
Mohamad, Effendi
Sukarma, Lukman
Salleh, Mohd Shukor
Salleh, Mohd Rizal
Mohamad, Noraiham
Raja Abdullah, Raja Izamshah
Md Ali, Mohd Amran
author_facet Ishak, Anuar
Mohamad, Effendi
Sukarma, Lukman
Salleh, Mohd Shukor
Salleh, Mohd Rizal
Mohamad, Noraiham
Raja Abdullah, Raja Izamshah
Md Ali, Mohd Amran
author_sort Ishak, Anuar
title Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
title_short Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
title_full Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
title_fullStr Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
title_full_unstemmed Cleaner Production Implementation In An E-Waste Recovery Plant By Using The Value Stream Mapping
title_sort cleaner production implementation in an e-waste recovery plant by using the value stream mapping
publisher Penerbit Universiti, UTeM
publishDate 2018
url http://eprints.utem.edu.my/id/eprint/22844/2/4269-12052-1-PB1.pdf
http://eprints.utem.edu.my/id/eprint/22844/
http://journal.utem.edu.my/index.php/jamt/article/view/4269/3372
_version_ 1709671909519523840
score 13.145442