Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company

Tough global competition requires every manufacturer to be more creative on ways to reduce every aspect of their operational cost. To remain competitive, manufacturers need to shorten the cycle time in New Product Introduction to capture the market share,reduce manufacturing cost and explore ingeni...

Full description

Saved in:
Bibliographic Details
Main Author: Rohana, Abdullah
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/15292/1/Development%20Of%20Man%20To%20Machine%20%28M2M%29%20Ratio%20Technique%20In%20Semiconductor%20Company.pdf
http://eprints.utem.edu.my/id/eprint/15292/
http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000057315
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.15292
record_format eprints
spelling my.utem.eprints.152922016-01-05T02:14:31Z http://eprints.utem.edu.my/id/eprint/15292/ Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company Rohana, Abdullah T Technology (General) Tough global competition requires every manufacturer to be more creative on ways to reduce every aspect of their operational cost. To remain competitive, manufacturers need to shorten the cycle time in New Product Introduction to capture the market share,reduce manufacturing cost and explore ingenious ways to improve productivity. Labor cost is among the key cost contributors that the manufacturers are focusing on and lean manufacturing is among the strategy taken by many companies to improve their competitive advantage. Labor productivity improvement is all about getting more units out with the same or lesser amount of labor. Before determining the ideal number of people required for the operation, a proper method of defining the current utilization of the labor working on the equipment in the production line is required. Once the current labor utilization is known, only then the ideal utilization of the operator can be accurately determined and recommendations for productivity improvements can be made. Hence, the purpose of this research is to develop a suitable work study technique to measure the labor productivity at the semi-auto back-end semiconductor manufacturing line. This thesis aims to discuss the development of a work study technique called the Man to Machine Ratio (M2M) to determine the present manning utilization and propose ideal man to machine ratio of the back end semiconductor manufacturing processes. M2M technique was derived through the determination of the key factors from the established method of Process Mapping and Multi Machine Chart. In addition, MOST Predetermined Time Standard was used as the method to perform work measurement. To assist in the measurement stage, the M2M template was designed using Microsoft Excel Spreadsheet.Next, five case studies utilizing the Lean Six Sigma DMAIC project management approach were carried out to test the suitability of the M2M method at the back end semiconductor manufacturing line based on a set of key criteria. The case study results showed that the M2M method was able to determine labor utilization and man to machine ratio, provide accurate data and have the flexibility to be used at both manufacturing and non manufacturing processes. Moreover, M2M is easy to develop, maintain and communicate and does not require a high skill set. By employing the M2M method together with DMAIC systematic approach, focus area for productivity improvement could be identified and the back end semiconductor company will be on the right track towards achieving a leaner operation. 2009 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/15292/1/Development%20Of%20Man%20To%20Machine%20%28M2M%29%20Ratio%20Technique%20In%20Semiconductor%20Company.pdf Rohana, Abdullah (2009) Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company. Masters thesis, UTeM. http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000057315
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Rohana, Abdullah
Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
description Tough global competition requires every manufacturer to be more creative on ways to reduce every aspect of their operational cost. To remain competitive, manufacturers need to shorten the cycle time in New Product Introduction to capture the market share,reduce manufacturing cost and explore ingenious ways to improve productivity. Labor cost is among the key cost contributors that the manufacturers are focusing on and lean manufacturing is among the strategy taken by many companies to improve their competitive advantage. Labor productivity improvement is all about getting more units out with the same or lesser amount of labor. Before determining the ideal number of people required for the operation, a proper method of defining the current utilization of the labor working on the equipment in the production line is required. Once the current labor utilization is known, only then the ideal utilization of the operator can be accurately determined and recommendations for productivity improvements can be made. Hence, the purpose of this research is to develop a suitable work study technique to measure the labor productivity at the semi-auto back-end semiconductor manufacturing line. This thesis aims to discuss the development of a work study technique called the Man to Machine Ratio (M2M) to determine the present manning utilization and propose ideal man to machine ratio of the back end semiconductor manufacturing processes. M2M technique was derived through the determination of the key factors from the established method of Process Mapping and Multi Machine Chart. In addition, MOST Predetermined Time Standard was used as the method to perform work measurement. To assist in the measurement stage, the M2M template was designed using Microsoft Excel Spreadsheet.Next, five case studies utilizing the Lean Six Sigma DMAIC project management approach were carried out to test the suitability of the M2M method at the back end semiconductor manufacturing line based on a set of key criteria. The case study results showed that the M2M method was able to determine labor utilization and man to machine ratio, provide accurate data and have the flexibility to be used at both manufacturing and non manufacturing processes. Moreover, M2M is easy to develop, maintain and communicate and does not require a high skill set. By employing the M2M method together with DMAIC systematic approach, focus area for productivity improvement could be identified and the back end semiconductor company will be on the right track towards achieving a leaner operation.
format Thesis
author Rohana, Abdullah
author_facet Rohana, Abdullah
author_sort Rohana, Abdullah
title Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
title_short Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
title_full Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
title_fullStr Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
title_full_unstemmed Development Of Man To Machine (M2M) Ratio Technique In Semiconductor Company
title_sort development of man to machine (m2m) ratio technique in semiconductor company
publishDate 2009
url http://eprints.utem.edu.my/id/eprint/15292/1/Development%20Of%20Man%20To%20Machine%20%28M2M%29%20Ratio%20Technique%20In%20Semiconductor%20Company.pdf
http://eprints.utem.edu.my/id/eprint/15292/
http://library.utem.edu.my:8000/elmu/index.jsp?module=webopac-d&action=fullDisplayRetriever.jsp&szMaterialNo=0000057315
_version_ 1665905636473307136
score 13.214268