Design and simulation of proposed automation system in existing manufacturing work environment

The manual operation may impact fluctuation in daily productivity. Manual processing also lead to increase in the number of queues, poor management of Work in Process (WIP) resulting in that impact low productivity. The objective of this project is to propose an automation system that would improve...

Full description

Saved in:
Bibliographic Details
Main Author: Salam, Zainila
Format: Thesis
Language:English
English
Published: 2013
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/14449/1/Design_And_Simulation_Of_Proposed_Automation_System_In_Existing_Manufacturing_Work_Environment039.pdf
http://eprints.utem.edu.my/id/eprint/14449/3/Design%20and%20simulation%20of%20proposed%20automation%20system%20in%20existing%20manufacturing%20environment.pdf
http://eprints.utem.edu.my/id/eprint/14449/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=85034
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.14449
record_format eprints
spelling my.utem.eprints.144492022-11-23T09:25:43Z http://eprints.utem.edu.my/id/eprint/14449/ Design and simulation of proposed automation system in existing manufacturing work environment Salam, Zainila T Technology (General) TS Manufactures The manual operation may impact fluctuation in daily productivity. Manual processing also lead to increase in the number of queues, poor management of Work in Process (WIP) resulting in that impact low productivity. The objective of this project is to propose an automation system that would improve productivity on actual manufacturing assembly area and validate the proposed system with maximize headcount utilization. This project develop modelling of the production system was performed using through ARENA simulation software that evaluates the impact of manufacturing productivity before and after the implementation of the proposed automation system improvement. The system simulation development will be based on assembly processt at PHN Industry, USJ. The main results showed that productivity has improved by 39% due to changes in implementation of conveyor system as part of the automation development based on simulation study. This validates the changes to the work process flow through a simple conveyor system to replace MHS. Further improvement on the simulation process in areas such as queue analysis on the time and number of parts waiting time could add greater complexity to the model resulting in increased of productivity. 2013 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/14449/1/Design_And_Simulation_Of_Proposed_Automation_System_In_Existing_Manufacturing_Work_Environment039.pdf text en http://eprints.utem.edu.my/id/eprint/14449/3/Design%20and%20simulation%20of%20proposed%20automation%20system%20in%20existing%20manufacturing%20environment.pdf Salam, Zainila (2013) Design and simulation of proposed automation system in existing manufacturing work environment. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=85034
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
English
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Salam, Zainila
Design and simulation of proposed automation system in existing manufacturing work environment
description The manual operation may impact fluctuation in daily productivity. Manual processing also lead to increase in the number of queues, poor management of Work in Process (WIP) resulting in that impact low productivity. The objective of this project is to propose an automation system that would improve productivity on actual manufacturing assembly area and validate the proposed system with maximize headcount utilization. This project develop modelling of the production system was performed using through ARENA simulation software that evaluates the impact of manufacturing productivity before and after the implementation of the proposed automation system improvement. The system simulation development will be based on assembly processt at PHN Industry, USJ. The main results showed that productivity has improved by 39% due to changes in implementation of conveyor system as part of the automation development based on simulation study. This validates the changes to the work process flow through a simple conveyor system to replace MHS. Further improvement on the simulation process in areas such as queue analysis on the time and number of parts waiting time could add greater complexity to the model resulting in increased of productivity.
format Thesis
author Salam, Zainila
author_facet Salam, Zainila
author_sort Salam, Zainila
title Design and simulation of proposed automation system in existing manufacturing work environment
title_short Design and simulation of proposed automation system in existing manufacturing work environment
title_full Design and simulation of proposed automation system in existing manufacturing work environment
title_fullStr Design and simulation of proposed automation system in existing manufacturing work environment
title_full_unstemmed Design and simulation of proposed automation system in existing manufacturing work environment
title_sort design and simulation of proposed automation system in existing manufacturing work environment
publishDate 2013
url http://eprints.utem.edu.my/id/eprint/14449/1/Design_And_Simulation_Of_Proposed_Automation_System_In_Existing_Manufacturing_Work_Environment039.pdf
http://eprints.utem.edu.my/id/eprint/14449/3/Design%20and%20simulation%20of%20proposed%20automation%20system%20in%20existing%20manufacturing%20environment.pdf
http://eprints.utem.edu.my/id/eprint/14449/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=85034
_version_ 1751540432446160896
score 13.159267