Analysis and Design of Integrated Vehicle and Crew Scheduling System Using GAIA Methodology
An integrated vehicle and crew scheduling is a complex problem to solve because of the large number of resources that need to be managed, and complexity of rules regarding allocating vehicle and crew shifts. However, there are potential benefits from integrating both scheduling including cost s...
Saved in:
Main Authors: | Shibghatullah, Abdul Samad, Abdullah, Nazri |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/13033/1/SamadCITRA2007.pdf http://eprints.utem.edu.my/id/eprint/13033/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integrated Dynamic Vehicle and Crew Scheduling Using Multi-Agent System
by: Shibghatullah, Abdul Samad, et al.
Published: (2005) -
The requirements for a dynamic bus crew scheduling system
by: Shibghatullah, Abdul Samad, et al.
Published: (2006) -
Real-time bus crew scheduling using multi-agents system
by: Eldabi, Tillal, et al.
Published: (2006) -
A framework for crew scheduling management system using multi-agents system
by: Shibghatullah, Abdul Samad, et al.
Published: (2006) -
A proposed multiagent model for bus crew scheduling
by: Shibghatullah, Abdul Samad, et al.
Published: (2006)