A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixt...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Center for Enhancing Knowledge (CEK), UK
2014
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/12893/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf http://eprints.utem.edu.my/id/eprint/12893/ http://www.eijst.org.uk/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utem.eprints.12893 |
---|---|
record_format |
eprints |
spelling |
my.utem.eprints.128932015-05-28T04:28:08Z http://eprints.utem.edu.my/id/eprint/12893/ A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS Sulaima, Mohamad Fani Lew, H. S. Lau, C. Y. Lim, Carolyn K. Y. Azily, Ahmad Tarmizi TK Electrical engineering. Electronics Nuclear engineering This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixture and swampy land affecting the building’s foundations. However, after thorough investigations, these speculations were proved to be inappropriate and the main cause was found to be due to the engineer’s miscalculation during the designing stage which leads to this catastrophic failure of the building. Rescue operation was initiated immediately after the collapse to rescue the victims and the aftermath of this tragedy had led to multiple reclamations. These reclamations include the endorsement of Building Control Act 1989 along Building Control (Accredited Checkers) Regulations 1989 as a stricter quality control measure. The analysis shows that this case may be due to unwanted mistakes or negligence of the engineers in carrying out their duties. Several actions were taken according to the ethical theories and codes of ethics. However after the analysis and evaluation were done, duty ethics and right ethics were more relevant to the collapse of Hotel New World case as compared to the other ethical theories and thus reclamations were done based on duty ethics and right ethics Center for Enhancing Knowledge (CEK), UK 2014-06-03 Article PeerReviewed application/pdf en http://eprints.utem.edu.my/id/eprint/12893/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf Sulaima, Mohamad Fani and Lew, H. S. and Lau, C. Y. and Lim, Carolyn K. Y. and Azily, Ahmad Tarmizi (2014) A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS. European International Journal of Science and Technology, 3 (4). pp. 21-30. ISSN 2304-9393 http://www.eijst.org.uk/ |
institution |
Universiti Teknikal Malaysia Melaka |
building |
UTEM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknikal Malaysia Melaka |
content_source |
UTEM Institutional Repository |
url_provider |
http://eprints.utem.edu.my/ |
language |
English |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Sulaima, Mohamad Fani Lew, H. S. Lau, C. Y. Lim, Carolyn K. Y. Azily, Ahmad Tarmizi A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
description |
This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixture and swampy land affecting the building’s foundations. However, after thorough investigations, these
speculations were proved to be inappropriate and the main cause was found to be due to the engineer’s miscalculation during the designing stage which leads to this catastrophic failure of the building. Rescue operation was initiated immediately after the collapse to rescue the victims and the aftermath of this tragedy had led to multiple reclamations. These reclamations include the endorsement of Building Control Act 1989 along Building Control (Accredited Checkers) Regulations 1989 as a stricter quality control measure. The analysis shows that this case may be due to unwanted mistakes or negligence of the engineers in carrying out their duties. Several actions were taken according to the ethical theories and codes of ethics. However after the analysis and evaluation were done, duty ethics and right ethics were more relevant to the
collapse of Hotel New World case as compared to the other ethical theories and thus reclamations were done based on duty ethics and right ethics |
format |
Article |
author |
Sulaima, Mohamad Fani Lew, H. S. Lau, C. Y. Lim, Carolyn K. Y. Azily, Ahmad Tarmizi |
author_facet |
Sulaima, Mohamad Fani Lew, H. S. Lau, C. Y. Lim, Carolyn K. Y. Azily, Ahmad Tarmizi |
author_sort |
Sulaima, Mohamad Fani |
title |
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
title_short |
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
title_full |
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
title_fullStr |
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
title_full_unstemmed |
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS |
title_sort |
case study of engineering ethics: lesson learned from building collapse disaster toward malaysian engineers |
publisher |
Center for Enhancing Knowledge (CEK), UK |
publishDate |
2014 |
url |
http://eprints.utem.edu.my/id/eprint/12893/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf http://eprints.utem.edu.my/id/eprint/12893/ http://www.eijst.org.uk/ |
_version_ |
1665905516098879488 |
score |
13.214268 |