Engineering Ethics Case Study of Hydroelectric Sayano- Sheshenkaya Accident: Lesson Learned for Malaysian Engineer
Sayano–Shushenskaya hydroelectric power station can be categorized as the biggest hydro power plant in Russia. The power plant full capacity is 6500MW. It is made up of 10 turbines which is each turbine rated power is 650MW. The accident that happened in the power station have been claimed many live...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Journal of Technology
2014
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/12890/1/2014-JOT-Engineering_Ethics.pdf http://eprints.utem.edu.my/id/eprint/12890/ http://www.jotechno.com/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!