A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS

This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixt...

Full description

Saved in:
Bibliographic Details
Main Authors: Sulaima, Mohamad Fani, Lew, H. S., Lau, C. Y., Lim, Carolyn K. Y., Azily, Ahmad Tarmizi
Format: Article
Language:English
Published: Center for Enhancing Knowledge (CEK), UK 2014
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/12642/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf
http://eprints.utem.edu.my/id/eprint/12642/
http://www.eijst.org.uk/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.12642
record_format eprints
spelling my.utem.eprints.126422015-05-28T04:26:35Z http://eprints.utem.edu.my/id/eprint/12642/ A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS Sulaima, Mohamad Fani Lew, H. S. Lau, C. Y. Lim, Carolyn K. Y. Azily, Ahmad Tarmizi TK Electrical engineering. Electronics Nuclear engineering This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixture and swampy land affecting the building’s foundations. However, after thorough investigations, these speculations were proved to be inappropriate and the main cause was found to be due to the engineer’s miscalculation during the designing stage which leads to this catastrophic failure of the building. Rescue operation was initiated immediately after the collapse to rescue the victims and the aftermath of this tragedy had led to multiple reclamations. These reclamations include the endorsement of Building Control Act 1989 along Building Control (Accredited Checkers) Regulations 1989 as a stricter quality control measure. The analysis shows that this case may be due to unwanted mistakes or negligence of the engineers in carrying out their duties. Several actions were taken according to the ethical theories and codes of ethics. However after the analysis and evaluation were done, duty ethics and right ethics were more relevant to the collapse of Hotel New World case as compared to the other ethical theories and thus reclamations were done based on duty ethics and right ethics Center for Enhancing Knowledge (CEK), UK 2014-06-03 Article PeerReviewed application/pdf en http://eprints.utem.edu.my/id/eprint/12642/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf Sulaima, Mohamad Fani and Lew, H. S. and Lau, C. Y. and Lim, Carolyn K. Y. and Azily, Ahmad Tarmizi (2014) A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS. European International Journal of Science and Technology, 3 (4). pp. 21-30. ISSN ISSN: 2304-9393 http://www.eijst.org.uk/
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Sulaima, Mohamad Fani
Lew, H. S.
Lau, C. Y.
Lim, Carolyn K. Y.
Azily, Ahmad Tarmizi
A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
description This paper presents the case study on the Hotel New World tragedy. The building collapsed on 15th March 1986 and an investigation was conducted to determine the main cause of this tragedy. There were several speculations made on the cause of the collapse such as internal explosion, bad concrete mixture and swampy land affecting the building’s foundations. However, after thorough investigations, these speculations were proved to be inappropriate and the main cause was found to be due to the engineer’s miscalculation during the designing stage which leads to this catastrophic failure of the building. Rescue operation was initiated immediately after the collapse to rescue the victims and the aftermath of this tragedy had led to multiple reclamations. These reclamations include the endorsement of Building Control Act 1989 along Building Control (Accredited Checkers) Regulations 1989 as a stricter quality control measure. The analysis shows that this case may be due to unwanted mistakes or negligence of the engineers in carrying out their duties. Several actions were taken according to the ethical theories and codes of ethics. However after the analysis and evaluation were done, duty ethics and right ethics were more relevant to the collapse of Hotel New World case as compared to the other ethical theories and thus reclamations were done based on duty ethics and right ethics
format Article
author Sulaima, Mohamad Fani
Lew, H. S.
Lau, C. Y.
Lim, Carolyn K. Y.
Azily, Ahmad Tarmizi
author_facet Sulaima, Mohamad Fani
Lew, H. S.
Lau, C. Y.
Lim, Carolyn K. Y.
Azily, Ahmad Tarmizi
author_sort Sulaima, Mohamad Fani
title A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
title_short A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
title_full A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
title_fullStr A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
title_full_unstemmed A CASE STUDY OF ENGINEERING ETHICS: LESSON LEARNED FROM BUILDING COLLAPSE DISASTER TOWARD MALAYSIAN ENGINEERS
title_sort case study of engineering ethics: lesson learned from building collapse disaster toward malaysian engineers
publisher Center for Enhancing Knowledge (CEK), UK
publishDate 2014
url http://eprints.utem.edu.my/id/eprint/12642/1/2014-A_Case_Study_of_Engineering_Ethics-Lesson_learned_from_building_collapse_disaster_toward_malaysian_engineers.pdf
http://eprints.utem.edu.my/id/eprint/12642/
http://www.eijst.org.uk/
_version_ 1665905508669718528
score 13.18916