Characteristic Mapping Of Overall Equipment Effectiveness Elements Through Simulation And The Taguchi Method
Overall Equipment Effectiveness (OEE) is one of the Key Performance Indicators (KPI) for measuring the implementation of Total Productive Maintenance (TPM). However, over time, OEE evolved into a system for the analysis of production data with the purpose of identifying potential areas for improveme...
Saved in:
Main Author: | Mohamad, Effendi |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti, Universiti Teknikal Malaysia Melaka
2013
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/12121/1/JHCD_2013_1.pdf http://eprints.utem.edu.my/id/eprint/12121/ http://jhcd.utem.edu.my/index.php?option=com_frontpage&Itemid=79 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Calculation of overall equipment effectiveness weight by Taguchi method with simulation
by: Yuniawan, Dani, et al.
Published: (2013) -
A Framework for Measuring The Effect of Changeover Time To
Overall Equipment Effectiveness
by: Muhamad Arifpin, Mansor, et al.
Published: (2015) -
Introduction to Taguchi Method
by: Mel, Maizirwan, et al.
Published: (2011) -
Taguchi method in bioprocess engineering: case studies
Published: (2011) -
Discrete event simulation as a decision making tool for improving overall line efficiency
by: Yong, Wen Yao
Published: (2022)