Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study
Value Stream Mapping (VSM) is a very comprehensive tool to that allows an organization to identify sources of waste and implements process improvements. This paper describes the adoption of VSM in a semiconductor manufacturing company to improve personnel efficiency and optimize headcount in the pr...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2013
|
Online Access: | http://eprints.utem.edu.my/id/eprint/10883/4/Elimination_of_waste_through_value_Add_Non_value_add_process_analysis_to_improve_cost_productivity_in_manufacturing__A_case_study.pdf http://eprints.utem.edu.my/id/eprint/10883/ https://ieeexplore.ieee.org/document/6962444/authors#authors |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utem.eprints.10883 |
---|---|
record_format |
eprints |
spelling |
my.utem.eprints.108832023-06-01T16:09:48Z http://eprints.utem.edu.my/id/eprint/10883/ Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study Kam, Choi Ng Chee, Peng Lim Chong, Kuan Eng Goh, Gerald Guan Gan Value Stream Mapping (VSM) is a very comprehensive tool to that allows an organization to identify sources of waste and implements process improvements. This paper describes the adoption of VSM in a semiconductor manufacturing company to improve personnel efficiency and optimize headcount in the production lines. Based on the future state of the value stream mapping a new production process flow was implemented. Non value added activities were reduced or removed by assigning butterfly operators to perform these tasks. The new system successfully resulted in the reduction of six headcounts in the taping process. This is equivalent to a saving of approximately eighty seven thousand Malaysian ringgits per annum. This systematic approach can be similarly employed by the lean practitioners to conduct lean activities in other manufacturing sectors. 2013-12-10 Conference or Workshop Item PeerReviewed text en http://eprints.utem.edu.my/id/eprint/10883/4/Elimination_of_waste_through_value_Add_Non_value_add_process_analysis_to_improve_cost_productivity_in_manufacturing__A_case_study.pdf Kam, Choi Ng and Chee, Peng Lim and Chong, Kuan Eng and Goh, Gerald Guan Gan (2013) Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study. In: 2013 IEEE International Conference On Industrial Engineering And Engineering Management, 10-13 Dec2013, Bangkok, Thailand. https://ieeexplore.ieee.org/document/6962444/authors#authors |
institution |
Universiti Teknikal Malaysia Melaka |
building |
UTEM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknikal Malaysia Melaka |
content_source |
UTEM Institutional Repository |
url_provider |
http://eprints.utem.edu.my/ |
language |
English |
description |
Value Stream Mapping (VSM) is a very comprehensive tool to that allows an organization to identify sources of waste and implements process improvements. This paper describes the adoption of VSM in a semiconductor manufacturing company to improve personnel efficiency and optimize headcount in the production lines. Based on the future state of the value stream mapping a new production process flow was implemented. Non value added activities were reduced or removed by assigning butterfly operators to perform these tasks. The new system successfully resulted in the reduction of six headcounts in the taping process. This is equivalent to a saving of approximately eighty seven thousand Malaysian ringgits per annum. This systematic approach can be similarly employed by the lean practitioners to conduct lean activities in other manufacturing sectors. |
format |
Conference or Workshop Item |
author |
Kam, Choi Ng Chee, Peng Lim Chong, Kuan Eng Goh, Gerald Guan Gan |
spellingShingle |
Kam, Choi Ng Chee, Peng Lim Chong, Kuan Eng Goh, Gerald Guan Gan Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
author_facet |
Kam, Choi Ng Chee, Peng Lim Chong, Kuan Eng Goh, Gerald Guan Gan |
author_sort |
Kam, Choi Ng |
title |
Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
title_short |
Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
title_full |
Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
title_fullStr |
Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
title_full_unstemmed |
Elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
title_sort |
elimination of waste through value add/non value add process analysis to improve cost productivity in manufacturing - a case study |
publishDate |
2013 |
url |
http://eprints.utem.edu.my/id/eprint/10883/4/Elimination_of_waste_through_value_Add_Non_value_add_process_analysis_to_improve_cost_productivity_in_manufacturing__A_case_study.pdf http://eprints.utem.edu.my/id/eprint/10883/ https://ieeexplore.ieee.org/document/6962444/authors#authors |
_version_ |
1768012331613159424 |
score |
13.214268 |