Multipronged Projects To Improve Flow And Responsiveness In Receiving
Receiving of a manufacturing facility involves handling of a high variety of items loaded from different suppliers. The process can be complicated as documents have to be processed, quality inspection and test, relabelling, good transportation, warehouse admission and storage, return goods and clear...
Saved in:
Main Author: | Koh, Han Teng |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2017
|
Subjects: | |
Online Access: | http://eprints.usm.my/53728/1/Multipronged%20Projects%20To%20Improve%20Flow%20And%20Responsiveness%20In%20Receiving_Koh%20Han%20Teng_M4_2017.pdf http://eprints.usm.my/53728/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Microstrip antenna for television and radio receiver
by: Fammy Faisal, Rasat
Published: (2004) -
DESIGN OF CENTRAL SOLAR TOWER RECEIVER
by: JARED SAMUEL S/O THANGGARAJ, JARED SAMUEL
Published: (2012) -
A risk-based project schedule estimation method to improve project reliability
by: Mansoorzadeh, Shiva, et al.
Published: (2012) -
Improvement on pressure distribution for venturi tube flow
by: Hamedan, Hazrel
Published: (2017) -
Improved refrigerant characteristics flow predictions in adiabatic capillary tube
by: Sulaimon, Shodiya, et al.
Published: (2012)