Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System

This thesis focused on manufacturing lead time and inventory cost reduction in medium mix low volume production with Pull system or Kanban system. The production is a fixed position machine manual assembly line. The initial condition of the production such as the manufacturing lead time and process...

Full description

Saved in:
Bibliographic Details
Main Author: Hwang, Jia Qi
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/53400/1/Application%20Of%20Pull-Kanban%20System%20To%20Reduce%20Inventory%20And%20Lead%20Time%20In%20A%20Manufacturing%20System_Hwang%20Jia%20Qi_M4_2017.pdf
http://eprints.usm.my/53400/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.53400
record_format eprints
spelling my.usm.eprints.53400 http://eprints.usm.my/53400/ Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System Hwang, Jia Qi T Technology TJ1-1570 Mechanical engineering and machinery This thesis focused on manufacturing lead time and inventory cost reduction in medium mix low volume production with Pull system or Kanban system. The production is a fixed position machine manual assembly line. The initial condition of the production such as the manufacturing lead time and process lead time was collected from time study and the data was analyzed. The submodule assembly processes were given attention as they consume raw material. Inventory level was collected in terms of cost from the ERP software of the company. In design stage, a mixed pull system which consisted of Kanban system and sequential pull system was designed. The submodules were evaluated based on some criteria such as customization level, size, lead time and whether they can be assembled externally and then were decided by using simulation and Design of Experiment (DoE). The quantity of Kanban was calculated and decided by using qualitative or quantitative approach and Taguchi method as well. The work procedure, information and material transfer steps were designed according to the available human resource and their skill. The result after Kanban implementation showed 45.97% lead time reduction from 33.72 days to 20.17 days and 28.49% inventory cost reduction from RM 132857.14 to RM 9500.00. After the termination stage stabilized, a Standard Operating Procedure(SOP) was prepared to maintain the improvement made. Universiti Sains Malaysia 2017-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/53400/1/Application%20Of%20Pull-Kanban%20System%20To%20Reduce%20Inventory%20And%20Lead%20Time%20In%20A%20Manufacturing%20System_Hwang%20Jia%20Qi_M4_2017.pdf Hwang, Jia Qi (2017) Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanik. (Submitted)
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic T Technology
TJ1-1570 Mechanical engineering and machinery
spellingShingle T Technology
TJ1-1570 Mechanical engineering and machinery
Hwang, Jia Qi
Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
description This thesis focused on manufacturing lead time and inventory cost reduction in medium mix low volume production with Pull system or Kanban system. The production is a fixed position machine manual assembly line. The initial condition of the production such as the manufacturing lead time and process lead time was collected from time study and the data was analyzed. The submodule assembly processes were given attention as they consume raw material. Inventory level was collected in terms of cost from the ERP software of the company. In design stage, a mixed pull system which consisted of Kanban system and sequential pull system was designed. The submodules were evaluated based on some criteria such as customization level, size, lead time and whether they can be assembled externally and then were decided by using simulation and Design of Experiment (DoE). The quantity of Kanban was calculated and decided by using qualitative or quantitative approach and Taguchi method as well. The work procedure, information and material transfer steps were designed according to the available human resource and their skill. The result after Kanban implementation showed 45.97% lead time reduction from 33.72 days to 20.17 days and 28.49% inventory cost reduction from RM 132857.14 to RM 9500.00. After the termination stage stabilized, a Standard Operating Procedure(SOP) was prepared to maintain the improvement made.
format Monograph
author Hwang, Jia Qi
author_facet Hwang, Jia Qi
author_sort Hwang, Jia Qi
title Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
title_short Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
title_full Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
title_fullStr Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
title_full_unstemmed Application Of Pull-Kanban System To Reduce Inventory And Lead Time In A Manufacturing System
title_sort application of pull-kanban system to reduce inventory and lead time in a manufacturing system
publisher Universiti Sains Malaysia
publishDate 2017
url http://eprints.usm.my/53400/1/Application%20Of%20Pull-Kanban%20System%20To%20Reduce%20Inventory%20And%20Lead%20Time%20In%20A%20Manufacturing%20System_Hwang%20Jia%20Qi_M4_2017.pdf
http://eprints.usm.my/53400/
_version_ 1738511199421595648
score 13.160551