Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method

The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical pat...

Full description

Saved in:
Bibliographic Details
Main Author: Yap, Han Yin
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf
http://eprints.usm.my/52151/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.52151
record_format eprints
spelling my.usm.eprints.52151 http://eprints.usm.my/52151/ Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method Yap, Han Yin T Technology TA Engineering (General). Civil engineering (General) The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical path in a construction project by using Monte Carlo Simulation Method to determine the criticality of the activities, forecast a most probable completion duration of a project as well as estimate the total cost of the project on a real project in Bayan Lepas, Penang. Critical Path Methods provides interrelationships of activities and scheduling of construction activities. However, CPM analysis is a deterministic process which does not account random variables. Thus, further analysis using Primavera P6 to generate CPM results as well as using Microsoft Excel to simulate the criticality of the activities and the cost of each activities. Comparing the conventional Critical Path Method with Monte Carlo Simulation Method, Monte Carlo Simulation Method shows more realistic results which close to the actual project progress. The restraint resources is estimated using Monte Carlo Simulation Method so that both result in duration wise and resource wise can be compared and optimized to provide a longest probable completion duration with minimum cost. Universiti Sains Malaysia 2017-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf Yap, Han Yin (2017) Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted)
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic T Technology
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology
TA Engineering (General). Civil engineering (General)
Yap, Han Yin
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
description The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical path in a construction project by using Monte Carlo Simulation Method to determine the criticality of the activities, forecast a most probable completion duration of a project as well as estimate the total cost of the project on a real project in Bayan Lepas, Penang. Critical Path Methods provides interrelationships of activities and scheduling of construction activities. However, CPM analysis is a deterministic process which does not account random variables. Thus, further analysis using Primavera P6 to generate CPM results as well as using Microsoft Excel to simulate the criticality of the activities and the cost of each activities. Comparing the conventional Critical Path Method with Monte Carlo Simulation Method, Monte Carlo Simulation Method shows more realistic results which close to the actual project progress. The restraint resources is estimated using Monte Carlo Simulation Method so that both result in duration wise and resource wise can be compared and optimized to provide a longest probable completion duration with minimum cost.
format Monograph
author Yap, Han Yin
author_facet Yap, Han Yin
author_sort Yap, Han Yin
title Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
title_short Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
title_full Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
title_fullStr Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
title_full_unstemmed Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
title_sort optimization of project duration and constraint resource using monte carlo method
publisher Universiti Sains Malaysia
publishDate 2017
url http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf
http://eprints.usm.my/52151/
_version_ 1729703922390532096
score 13.18916