Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method
The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical pat...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2017
|
Subjects: | |
Online Access: | http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf http://eprints.usm.my/52151/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.52151 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.52151 http://eprints.usm.my/52151/ Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method Yap, Han Yin T Technology TA Engineering (General). Civil engineering (General) The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical path in a construction project by using Monte Carlo Simulation Method to determine the criticality of the activities, forecast a most probable completion duration of a project as well as estimate the total cost of the project on a real project in Bayan Lepas, Penang. Critical Path Methods provides interrelationships of activities and scheduling of construction activities. However, CPM analysis is a deterministic process which does not account random variables. Thus, further analysis using Primavera P6 to generate CPM results as well as using Microsoft Excel to simulate the criticality of the activities and the cost of each activities. Comparing the conventional Critical Path Method with Monte Carlo Simulation Method, Monte Carlo Simulation Method shows more realistic results which close to the actual project progress. The restraint resources is estimated using Monte Carlo Simulation Method so that both result in duration wise and resource wise can be compared and optimized to provide a longest probable completion duration with minimum cost. Universiti Sains Malaysia 2017-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf Yap, Han Yin (2017) Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted) |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
T Technology TA Engineering (General). Civil engineering (General) |
spellingShingle |
T Technology TA Engineering (General). Civil engineering (General) Yap, Han Yin Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
description |
The use of schedule monitoring and control is an important management tools and program management. Tools are available to prevent failure in construction of building that can affect the performance of the construction project. This study reviews as alternative approach to calculate the critical path in a construction project by using Monte Carlo Simulation Method to determine the criticality of the activities, forecast a most probable completion duration of a project as well as estimate the total cost of the project on a real project in Bayan Lepas, Penang. Critical Path Methods provides interrelationships of activities and scheduling of construction activities. However, CPM analysis is a deterministic process which does not account random variables. Thus, further analysis using Primavera P6 to generate CPM results as well as using Microsoft Excel to simulate the criticality of the activities and the cost of each activities. Comparing the conventional Critical Path Method with Monte Carlo Simulation Method, Monte Carlo Simulation Method shows more realistic results which close to the actual project progress. The restraint resources is estimated using Monte Carlo Simulation Method so that both result in duration wise and resource wise can be compared and optimized to provide a longest probable completion duration with minimum cost. |
format |
Monograph |
author |
Yap, Han Yin |
author_facet |
Yap, Han Yin |
author_sort |
Yap, Han Yin |
title |
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
title_short |
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
title_full |
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
title_fullStr |
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
title_full_unstemmed |
Optimization Of Project Duration And Constraint Resource Using Monte Carlo Method |
title_sort |
optimization of project duration and constraint resource using monte carlo method |
publisher |
Universiti Sains Malaysia |
publishDate |
2017 |
url |
http://eprints.usm.my/52151/1/Optimization%20Of%20Project%20Duration%20And%20Constraint%20Resource%20Using%20Monte%20Carlo%20Method_Yap%20Han%20Yin_A9_2017.pdf http://eprints.usm.my/52151/ |
_version_ |
1729703922390532096 |
score |
13.18916 |