RMK 437- Penilaian (September 1997)

UNIVERSITI SAINS MALAYSIA Peperiksaan Semester Pertama Sidang Akademik 1997/98 SEPTEMBER 1997 RMK 437- PENILAIAN Masa: 3 jam Sila pastikan bahawa kertas peperiksaan ini mengandungi TIGA mukasurat yang tercetak sebelum anda memulakan peperiksaan ini. Jawab EMPAT soalan sahaja.

Saved in:
Bibliographic Details
Main Author: PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
Format: Teaching Resource
Language:English
Published: 1997
Subjects:
Online Access:http://eprints.usm.my/51283/1/RMK%20437-%20PENILAIAN.pdf
http://eprints.usm.my/51283/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.51283
record_format eprints
spelling my.usm.eprints.51283 http://eprints.usm.my/51283/ RMK 437- Penilaian (September 1997) PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu TH1000-1725 Systems of building construction UNIVERSITI SAINS MALAYSIA Peperiksaan Semester Pertama Sidang Akademik 1997/98 SEPTEMBER 1997 RMK 437- PENILAIAN Masa: 3 jam Sila pastikan bahawa kertas peperiksaan ini mengandungi TIGA mukasurat yang tercetak sebelum anda memulakan peperiksaan ini. Jawab EMPAT soalan sahaja. 1997-09 Teaching Resource NonPeerReviewed application/pdf en http://eprints.usm.my/51283/1/RMK%20437-%20PENILAIAN.pdf PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu (1997) RMK 437- Penilaian (September 1997). [Teaching Resource] (Submitted)
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TH1000-1725 Systems of building construction
spellingShingle TH1000-1725 Systems of building construction
PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
RMK 437- Penilaian (September 1997)
description UNIVERSITI SAINS MALAYSIA Peperiksaan Semester Pertama Sidang Akademik 1997/98 SEPTEMBER 1997 RMK 437- PENILAIAN Masa: 3 jam Sila pastikan bahawa kertas peperiksaan ini mengandungi TIGA mukasurat yang tercetak sebelum anda memulakan peperiksaan ini. Jawab EMPAT soalan sahaja.
format Teaching Resource
author PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
author_facet PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
author_sort PPPB, Pusat Pengajian Perumahan Bangunan & Perancangan (School of Houu
title RMK 437- Penilaian (September 1997)
title_short RMK 437- Penilaian (September 1997)
title_full RMK 437- Penilaian (September 1997)
title_fullStr RMK 437- Penilaian (September 1997)
title_full_unstemmed RMK 437- Penilaian (September 1997)
title_sort rmk 437- penilaian (september 1997)
publishDate 1997
url http://eprints.usm.my/51283/1/RMK%20437-%20PENILAIAN.pdf
http://eprints.usm.my/51283/
_version_ 1724074437462982656
score 13.15806