Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan

The occurrence of variation orders (VOs) in the construction industry is a regular trend all over the world. Hydropower projects are no exception, and it is difficult to find a hydropower project in Pakistan that does not experience VOs. The current research investigates the causes and impacts of...

Full description

Saved in:
Bibliographic Details
Main Authors: Hanif, Hashim, Khurshid, Muhammad Bilal, Lindhard, Søren Munch, Aslam, Zuhaib
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2016
Subjects:
Online Access:http://eprints.usm.my/41451/1/JCDC_21%282%29_Art_3%2837-53%29.pdf
http://eprints.usm.my/41451/
http://web.usm.my/jcdc/vol21_2_2016/JCDC%2021(2)_Art%203(37-53).pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.41451
record_format eprints
spelling my.usm.eprints.41451 http://eprints.usm.my/41451/ Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan Hanif, Hashim Khurshid, Muhammad Bilal Lindhard, Søren Munch Aslam, Zuhaib TH1-9745 Building construction The occurrence of variation orders (VOs) in the construction industry is a regular trend all over the world. Hydropower projects are no exception, and it is difficult to find a hydropower project in Pakistan that does not experience VOs. The current research investigates the causes and impacts of VOs in mega hydropower projects using case studies of three mega hydropower projects in Pakistan. The results illustrate that errors and omissions in design, changes in scope and changes in design were among the three top contributing factors to VOs in hydropower projects that resulted in time and cost overruns. Because of VOs, the time overrun is 20%, and the cost overrun is 31% with respect to the planned time and cost of the project. Based on this research, the study recommends measures to curb the causes and impacts of VOs to optimise the construction process of mega hydropower projects. Penerbit Universiti Sains Malaysia 2016 Article PeerReviewed application/pdf en http://eprints.usm.my/41451/1/JCDC_21%282%29_Art_3%2837-53%29.pdf Hanif, Hashim and Khurshid, Muhammad Bilal and Lindhard, Søren Munch and Aslam, Zuhaib (2016) Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan. Journal of Construction in Developing Countries , 21 (2). pp. 37-53. ISSN 1823-6499 http://web.usm.my/jcdc/vol21_2_2016/JCDC%2021(2)_Art%203(37-53).pdf
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Hanif, Hashim
Khurshid, Muhammad Bilal
Lindhard, Søren Munch
Aslam, Zuhaib
Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
description The occurrence of variation orders (VOs) in the construction industry is a regular trend all over the world. Hydropower projects are no exception, and it is difficult to find a hydropower project in Pakistan that does not experience VOs. The current research investigates the causes and impacts of VOs in mega hydropower projects using case studies of three mega hydropower projects in Pakistan. The results illustrate that errors and omissions in design, changes in scope and changes in design were among the three top contributing factors to VOs in hydropower projects that resulted in time and cost overruns. Because of VOs, the time overrun is 20%, and the cost overrun is 31% with respect to the planned time and cost of the project. Based on this research, the study recommends measures to curb the causes and impacts of VOs to optimise the construction process of mega hydropower projects.
format Article
author Hanif, Hashim
Khurshid, Muhammad Bilal
Lindhard, Søren Munch
Aslam, Zuhaib
author_facet Hanif, Hashim
Khurshid, Muhammad Bilal
Lindhard, Søren Munch
Aslam, Zuhaib
author_sort Hanif, Hashim
title Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
title_short Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
title_full Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
title_fullStr Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
title_full_unstemmed Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan
title_sort impact of variation orders on time and cost in mega hydropower projects of pakistan
publisher Penerbit Universiti Sains Malaysia
publishDate 2016
url http://eprints.usm.my/41451/1/JCDC_21%282%29_Art_3%2837-53%29.pdf
http://eprints.usm.my/41451/
http://web.usm.my/jcdc/vol21_2_2016/JCDC%2021(2)_Art%203(37-53).pdf
_version_ 1643710225817010176
score 13.18916