EAS 355-2 - Advanced Concrete Technology - April/May 2009
Second Semester Examination 2008/2009 Academic Session April/May 2009 Duration : 2 hours
Saved in:
Main Author: | |
---|---|
Format: | Teaching Resource |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.usm.my/27673/1/EAS_355-2_-_Advanced_Concrete_Technology_April_May_2009.pdf http://eprints.usm.my/27673/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.27673 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.27673 http://eprints.usm.my/27673/ EAS 355-2 - Advanced Concrete Technology - April/May 2009 PPKAW, Pusat Pengajian Kejuruteraan Awam TA1-2040 Engineering (General). Civil engineering (General) Second Semester Examination 2008/2009 Academic Session April/May 2009 Duration : 2 hours 2009-05 Teaching Resource NonPeerReviewed application/pdf en http://eprints.usm.my/27673/1/EAS_355-2_-_Advanced_Concrete_Technology_April_May_2009.pdf PPKAW, Pusat Pengajian Kejuruteraan Awam (2009) EAS 355-2 - Advanced Concrete Technology - April/May 2009. [Teaching Resource] |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
TA1-2040 Engineering (General). Civil engineering (General) |
spellingShingle |
TA1-2040 Engineering (General). Civil engineering (General) PPKAW, Pusat Pengajian Kejuruteraan Awam EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
description |
Second Semester Examination
2008/2009 Academic Session
April/May 2009
Duration : 2 hours |
format |
Teaching Resource |
author |
PPKAW, Pusat Pengajian Kejuruteraan Awam |
author_facet |
PPKAW, Pusat Pengajian Kejuruteraan Awam |
author_sort |
PPKAW, Pusat Pengajian Kejuruteraan Awam |
title |
EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
title_short |
EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
title_full |
EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
title_fullStr |
EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
title_full_unstemmed |
EAS 355-2 - Advanced Concrete Technology - April/May 2009 |
title_sort |
eas 355-2 - advanced concrete technology - april/may 2009 |
publishDate |
2009 |
url |
http://eprints.usm.my/27673/1/EAS_355-2_-_Advanced_Concrete_Technology_April_May_2009.pdf http://eprints.usm.my/27673/ |
_version_ |
1703961427139624960 |
score |
13.211869 |