Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective
Project performance is a critical issue for the construction industry. Project deliverables such as timely completion and client satisfaction are often used as yardsticks to determine success. More often that not, the success of a construction project hinges on the ability of the construction pro...
محفوظ في:
المؤلفون الرئيسيون: | , , , |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
2009
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.usm.my/16071/1/Arman_Abdul_Razak.pdf http://eprints.usm.my/16071/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
my.usm.eprints.16071 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.16071 http://eprints.usm.my/16071/ Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective Abdul Razak, Arman Jaafar, Mastura Abdullah, Shardy Muhammad, Samsiah TH1-9745 Building construction Project performance is a critical issue for the construction industry. Project deliverables such as timely completion and client satisfaction are often used as yardsticks to determine success. More often that not, the success of a construction project hinges on the ability of the construction project manager to effectively perform his job functions with the intended efficacy. As such this paper intends to firstly identify the relationship between work environment factors and job performance and secondly to rank these work environment factors in the order of importance. Respondents comprising of project managers in construction firms throughout the northern region of Peninsular Malaysia were selected as the sample population. Questionnaires were then distributed and collected. From the analysis conducted on the gathered data, it was found that the performance level of the project manager had a very high correlation with the level of authority as well as the type of client within a specific project. 2009 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.usm.my/16071/1/Arman_Abdul_Razak.pdf Abdul Razak, Arman and Jaafar, Mastura and Abdullah, Shardy and Muhammad, Samsiah (2009) Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective. In: International Conference Of Construction Industri 2009, 30 Julai-1 Ogos 2009, Padang, Indonesia. |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
TH1-9745 Building construction |
spellingShingle |
TH1-9745 Building construction Abdul Razak, Arman Jaafar, Mastura Abdullah, Shardy Muhammad, Samsiah Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
description |
Project performance is a critical issue for the construction industry. Project deliverables such
as timely completion and client satisfaction are often used as yardsticks to determine success.
More often that not, the success of a construction project hinges on the ability of the
construction project manager to effectively perform his job functions with the intended
efficacy. As such this paper intends to firstly identify the relationship between work
environment factors and job performance and secondly to rank these work environment
factors in the order of importance. Respondents comprising of project managers in
construction firms throughout the northern region of Peninsular Malaysia were selected as
the sample population. Questionnaires were then distributed and collected. From the analysis
conducted on the gathered data, it was found that the performance level of the project
manager had a very high correlation with the level of authority as well as the type of client
within a specific project. |
format |
Conference or Workshop Item |
author |
Abdul Razak, Arman Jaafar, Mastura Abdullah, Shardy Muhammad, Samsiah |
author_facet |
Abdul Razak, Arman Jaafar, Mastura Abdullah, Shardy Muhammad, Samsiah |
author_sort |
Abdul Razak, Arman |
title |
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
title_short |
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
title_full |
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
title_fullStr |
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
title_full_unstemmed |
Work Environment Factors And Job Performance: The Construction Project Manager’s Perspective |
title_sort |
work environment factors and job performance: the construction project manager’s perspective |
publishDate |
2009 |
url |
http://eprints.usm.my/16071/1/Arman_Abdul_Razak.pdf http://eprints.usm.my/16071/ |
_version_ |
1643703138109095936 |
score |
13.153044 |