From modelling to management of project delivery: review on clash management process with BIM in Malaysia

CITP 2016-2020 (Construction Industry Transformation Program) targets higher rate of implementation for Building Information Modelling (BIM). The Industrial Revolution (IR) 4.0 Roadmap for Construction Industry 2020-2025 further emphasizes the utilization of Building Information Modelling (BIM) a...

Full description

Saved in:
Bibliographic Details
Main Authors: Fawaz, Mustafa, Ibrahim, Rahinah, Rashidi, Ali, Abdul Ghafar, Maszura
Format: Article
Published: Construction Research Institute of Malaysia (CREAM) 2021
Online Access:http://psasir.upm.edu.my/id/eprint/97395/
https://www.cream.my/usr/product.aspx?pgid=88&id=55&grpid=13&lang=en
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.97395
record_format eprints
spelling my.upm.eprints.973952024-07-12T08:05:09Z http://psasir.upm.edu.my/id/eprint/97395/ From modelling to management of project delivery: review on clash management process with BIM in Malaysia Fawaz, Mustafa Ibrahim, Rahinah Rashidi, Ali Abdul Ghafar, Maszura CITP 2016-2020 (Construction Industry Transformation Program) targets higher rate of implementation for Building Information Modelling (BIM). The Industrial Revolution (IR) 4.0 Roadmap for Construction Industry 2020-2025 further emphasizes the utilization of Building Information Modelling (BIM) and Industrialized Building Systems (IBS) to increase productivity in the Malaysian construction industry. One benefit of BIM is enhancing interactions between different team members and reducing the clashes since the design phase of an industrialized project. Despite all the efforts to avoid the construction clashes during design stage with the use of BIM models, there has been no ideal construction process with nil clashes. Hence, our study aims to identify the key areas where BIM could support the clash management process during a project’s lifecycle. The paper discusses about the clash management process, the barriers and challenges for BIM implementation, and the use of BIM technology for developing countries surrounding the BIM technology’s process, organizational stakeholders, and the BIM product. In reference to Malaysia, results include the extant of BIM impacts on the construction industry due to its restrictions during the design stage of the project. Results found alignment of BIM products to the management team’s actions during clash management process has potential to support BIM implementation and improve construction productivity, and thereby, reducing future reworks. Further studies are recommended to focus on automation in BIM technology during the construction stage specifically for improving in-situ clash management. This paper contributes to improving construction productivity and professionalism with BIM and industrialized building products to support IR 4.0 Roadmap for Construction Industry 2020- 2025 in Malaysia. Construction Research Institute of Malaysia (CREAM) 2021 Article PeerReviewed Fawaz, Mustafa and Ibrahim, Rahinah and Rashidi, Ali and Abdul Ghafar, Maszura (2021) From modelling to management of project delivery: review on clash management process with BIM in Malaysia. Malaysian Construction Research Journal, 35 (3). pp. 57-71. ISSN 1985 - 3807; ESSN : 2590 - 4140 (In Press) https://www.cream.my/usr/product.aspx?pgid=88&id=55&grpid=13&lang=en
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
description CITP 2016-2020 (Construction Industry Transformation Program) targets higher rate of implementation for Building Information Modelling (BIM). The Industrial Revolution (IR) 4.0 Roadmap for Construction Industry 2020-2025 further emphasizes the utilization of Building Information Modelling (BIM) and Industrialized Building Systems (IBS) to increase productivity in the Malaysian construction industry. One benefit of BIM is enhancing interactions between different team members and reducing the clashes since the design phase of an industrialized project. Despite all the efforts to avoid the construction clashes during design stage with the use of BIM models, there has been no ideal construction process with nil clashes. Hence, our study aims to identify the key areas where BIM could support the clash management process during a project’s lifecycle. The paper discusses about the clash management process, the barriers and challenges for BIM implementation, and the use of BIM technology for developing countries surrounding the BIM technology’s process, organizational stakeholders, and the BIM product. In reference to Malaysia, results include the extant of BIM impacts on the construction industry due to its restrictions during the design stage of the project. Results found alignment of BIM products to the management team’s actions during clash management process has potential to support BIM implementation and improve construction productivity, and thereby, reducing future reworks. Further studies are recommended to focus on automation in BIM technology during the construction stage specifically for improving in-situ clash management. This paper contributes to improving construction productivity and professionalism with BIM and industrialized building products to support IR 4.0 Roadmap for Construction Industry 2020- 2025 in Malaysia.
format Article
author Fawaz, Mustafa
Ibrahim, Rahinah
Rashidi, Ali
Abdul Ghafar, Maszura
spellingShingle Fawaz, Mustafa
Ibrahim, Rahinah
Rashidi, Ali
Abdul Ghafar, Maszura
From modelling to management of project delivery: review on clash management process with BIM in Malaysia
author_facet Fawaz, Mustafa
Ibrahim, Rahinah
Rashidi, Ali
Abdul Ghafar, Maszura
author_sort Fawaz, Mustafa
title From modelling to management of project delivery: review on clash management process with BIM in Malaysia
title_short From modelling to management of project delivery: review on clash management process with BIM in Malaysia
title_full From modelling to management of project delivery: review on clash management process with BIM in Malaysia
title_fullStr From modelling to management of project delivery: review on clash management process with BIM in Malaysia
title_full_unstemmed From modelling to management of project delivery: review on clash management process with BIM in Malaysia
title_sort from modelling to management of project delivery: review on clash management process with bim in malaysia
publisher Construction Research Institute of Malaysia (CREAM)
publishDate 2021
url http://psasir.upm.edu.my/id/eprint/97395/
https://www.cream.my/usr/product.aspx?pgid=88&id=55&grpid=13&lang=en
_version_ 1805889515086151680
score 13.211869