Opening the pandora’s box of issues in the Industrialised Building System (IBS) in Malaysia: a thematic review
Under the Malaysian Construction Industry Transformation Programme (CITP) 2016–2020, IBS has been proposed as one of the alternative solutions for replacing conventional construction. Numerous IBS advantages have been documented and discovered since its first implementation in the 90s’. However, the...
Saved in:
Main Author: | Mohd Zairul |
---|---|
Format: | Article |
Published: |
Tamkang University Press
2021
|
Online Access: | http://psasir.upm.edu.my/id/eprint/94436/ http://jase.tku.edu.tw/articles/jase-202204-25-2-0006 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Opening the pandora box of issues in the industrialized building system in Malaysia: a thematic review
by: Mohd Noor, Mohd Zairul
Published: (2020) -
A thematic review on Industrialised Building System (IBS) publications from 2015-2019: analysis of patterns and trends for future studies of IBS in Malaysia
by: Mohd Noor, Mohd Zairul
Published: (2021) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
Published: (2014) -
Payment issues in Malaysia industrialised building system (IBS): Literature visit
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015)