Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia

Background: The construction industry needs to be resilient in Malaysian economy because it contributes significantly to its socio-economy, gross domestic production, and positive employment ratios. Objective: This study is a chronological review of the fundamental issues related to the industrializ...

Full description

Saved in:
Bibliographic Details
Main Authors: Rashid, Ali, Ibrahim, Rahinah
Format: Article
Language:English
Published: Bentham Open 2017
Online Access:http://psasir.upm.edu.my/id/eprint/62152/1/Industrialized%20construction%20chronology.pdf
http://psasir.upm.edu.my/id/eprint/62152/
https://benthamopen.com/ABSTRACT/TOBCTJ-11-286
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.62152
record_format eprints
spelling my.upm.eprints.621522019-04-17T02:39:44Z http://psasir.upm.edu.my/id/eprint/62152/ Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia Rashid, Ali Ibrahim, Rahinah Background: The construction industry needs to be resilient in Malaysian economy because it contributes significantly to its socio-economy, gross domestic production, and positive employment ratios. Objective: This study is a chronological review of the fundamental issues related to the industrialization of construction in Malaysia. It covers different aspects of industrialized building systems (IBSs), which have the potential to promote productivity resiliency by stakeholders in Malaysian construction industry. Method: Furthermore, this study examines the fundamental issues related to current terminologies and the numerous classifications of industrialized construction. It also examines related works that support potential critical success factors and the current disputes affecting the adoption of industrialized construction in Malaysia. Discussion and Conclusion: This study redefines an IBS as a computer-integrated design, manufacturing, and construction system, using the concept of off-site or on-site prefabricated mass-production techniques within a controlled environment. Furthermore, the system uses proper coordination and planning to transport, position, and install building components with minimal in-situ work. With the success of modern methods of construction, IBS is expected to transform construction industry practices through the application of manufacturing and mechanization concepts. The study concludes by recommending incorporation of computer-aided learning technology at all workforces’ training levels when learning IBS applications. It is expected that this will improve performance in terms of construction quality, waste reduction, occupational safety, cost effectiveness, and productivity. Bentham Open 2017 Article PeerReviewed text en http://psasir.upm.edu.my/id/eprint/62152/1/Industrialized%20construction%20chronology.pdf Rashid, Ali and Ibrahim, Rahinah (2017) Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia. Open Construction and Building Technology Journal, 11. 286 - 300. ISSN 1874-8368 https://benthamopen.com/ABSTRACT/TOBCTJ-11-286 10.2174/1874836801711010286
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
description Background: The construction industry needs to be resilient in Malaysian economy because it contributes significantly to its socio-economy, gross domestic production, and positive employment ratios. Objective: This study is a chronological review of the fundamental issues related to the industrialization of construction in Malaysia. It covers different aspects of industrialized building systems (IBSs), which have the potential to promote productivity resiliency by stakeholders in Malaysian construction industry. Method: Furthermore, this study examines the fundamental issues related to current terminologies and the numerous classifications of industrialized construction. It also examines related works that support potential critical success factors and the current disputes affecting the adoption of industrialized construction in Malaysia. Discussion and Conclusion: This study redefines an IBS as a computer-integrated design, manufacturing, and construction system, using the concept of off-site or on-site prefabricated mass-production techniques within a controlled environment. Furthermore, the system uses proper coordination and planning to transport, position, and install building components with minimal in-situ work. With the success of modern methods of construction, IBS is expected to transform construction industry practices through the application of manufacturing and mechanization concepts. The study concludes by recommending incorporation of computer-aided learning technology at all workforces’ training levels when learning IBS applications. It is expected that this will improve performance in terms of construction quality, waste reduction, occupational safety, cost effectiveness, and productivity.
format Article
author Rashid, Ali
Ibrahim, Rahinah
spellingShingle Rashid, Ali
Ibrahim, Rahinah
Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
author_facet Rashid, Ali
Ibrahim, Rahinah
author_sort Rashid, Ali
title Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
title_short Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
title_full Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
title_fullStr Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
title_full_unstemmed Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia
title_sort industrialized construction chronology: the disputes and success factors for a resilient construction industry in malaysia
publisher Bentham Open
publishDate 2017
url http://psasir.upm.edu.my/id/eprint/62152/1/Industrialized%20construction%20chronology.pdf
http://psasir.upm.edu.my/id/eprint/62152/
https://benthamopen.com/ABSTRACT/TOBCTJ-11-286
_version_ 1643837683199377408
score 13.160551